Similar Projects
Providence Church Addition
Addition, Infrastructure
Conception
$2,000,000 CJ est. value
Lynchburg, VA 24502

College Lake Dam Removal - ME018 - City of Lynchburg
Demolition, Infrastructure
Conception
$20,000,000 CJ est. value
Lynchburg, VA 24501

Runway 4-22 Rehabilitation and Lighting Upgrade - City of Lynchburg
Infrastructure
Design
$10,800,000 CJ est. value
Lynchburg, VA 24502

Long John Silver's / Lynchburg
Demolition, New Construction, Infrastructure - 2,000 SF
Design
$500,000 CJ est. value
Lynchburg, VA 24502

RFP Design - Bedford Avenue Bridge Replacement
New Construction, Infrastructure
Bidding
$721,000 CJ est. value
Lynchburg, VA 24504

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

College Hill Neighborhood Center Playground Replacement
Renovation
Results
$45,000 est. value
Lynchburg, VA 24504

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

West Edge Apartments Formerly Midtown Mixed-Use
New Construction, Infrastructure
Construction
$115,000,000 CJ est. value
Lynchburg, VA 24502

Wyndsor View Townhomes / Lynchburg
New Construction, Infrastructure
Pending Verification
$33,000,000 CJ est. value
Lynchburg, VA 24504

Clover Place Self Storage
New Construction, Infrastructure - 3,200 SF
Pending Verification
$850,000 CJ est. value
Lynchburg, VA 24501

Field House Addition at Liberty University East Campus
New Construction, Infrastructure
Conception
$8,000,000 CJ est. value
Lynchburg, VA 24502

Site Plan - Vactor Building - City of Lynchburg
Demolition, New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Lynchburg, VA 24501

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23464

Last Updated 06/29/2023 10:09 AM
Project Title

Restroom Facility Athletic Field

Physical Address View project details and contacts
City, State (County) Lynchburg, VA 24504   (Lynchburg City County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Buckingham County School Board is inviting persons or firms to submit sealed bids on the Restroom Facility for the Buckingham County Middle School Athletic Field Vendor questions must be submitted via email to brent@architecturalpartners.com The scope of this project will be as follows and indicated in the drawings and specifications: 1. The Project consists of site work and construction of a free-standing toilet facility for Buckingham County Middle School. The new building shall be located adjacent to the existing softball field. 2. The building will consist of a multi stall toilet for both Men and Women. A Family use single stall toilet and a small janitor's closet will also be provided. The toilet facilities will be in compliance with the Americans with Disabilities Act (ADA). 3. The building will consist of the following: o Concrete floor slab o Exterior walls will be composed of a masonry knee wall with wood framed upper wall. Interior walls will be wood framed. Roof framing will be prefabricated wood trusses. o Walls and ceilings will be Gypsum Wall Board (GWB). Walls will receive epoxy paint and ceiling will be painted with latex paint. o Stalls located in the Men's and Women's toilets will be HDPE. Counters will be solid surface. o A standing seam metal roof will be installed over solid sheathing. o Exterior finishes will be painted masonry veneer and cement fiber board and batten siding. o Metal gutters will discharge into an underground system. o Building will be heated and ventilated only. 4. New doors and hardware shall match the existing doors and hardware in style and finish. (no exceptions) 5. A multi-level water fountain / bottle filler will be provided. 6. New concrete sidewalks will be provided to tie into existing sidewalks surrounding the building. 7. Underground storm sewer, sanitary sewer and water will be provided to tie new work into existing systems. 8. Electrical service for the new building will be provided from the existing Middle School mechanical room. 9. All disturbance of yards and the surrounding site are to be restored to present conditions. 10. The project is subject to the Davis-Bacon Act. If any prospective Bidder has questions about the scope of this project, the prospective Bidder shall contact the Architect no later than July 19, 2023, 5:00 p.m

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents