Similar Projects
Allegro of Noblesville
New Construction, Infrastructure
Conception
$83,000,000 est. value
Noblesville, IN 46060

Reconstruction of College Avenue - City of Carmel
Alteration
Conception
$250,000 est. value
Carmel, IN

AutoZone #5765 / Indianapolis
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Indianapolis, IN 46217

AutoZone #5765 / Indianapolis
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Indianapolis, IN 46217

City of Carmel - Clay Township Center - Addition - Bid-1 (Demolition, Civil Site Work and Building Shell)
Addition, Demolition, Infrastructure
Bidding
$300,000 CJ est. value
Carmel, IN 46032

City of Carmel - Clay Township Center - Addition - Bid-1 (Demolition, Civil Site Work and Building Shell)
Addition, Demolition, Infrastructure
Bidding
$300,000 CJ est. value
Carmel, IN 46032

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Asphalt Road Resurfacing and Miscellaneous Paving Work
Results
Fishers, IN 46038

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Gorman & Bunch Orthodontics
New Construction, Infrastructure - 9,000 SF
Construction
$2,000,000 CJ est. value
Fishers, IN 46037

Gorman & Bunch Orthodontics
New Construction, Infrastructure - 9,000 SF
Construction
$2,000,000 CJ est. value
Fishers, IN 46037

Woods Robinson Briggs
New Construction, Infrastructure - 318,000 SF
Pending Verification
$100,000,000 CJ est. value
Westfield, IN 46074

Containers on College
New Construction, Infrastructure - 15,800 SF
Pending Verification
$5,000,000 CJ est. value
Indianapolis, IN 46202

Midtown At Westfield
New Construction, Infrastructure
Conception
$600,000,000 CJ est. value
Westfield, IN 46074

Last Updated 11/22/2022 04:33 PM
Project Title

Water System Improvements

Physical Address View project details and contacts
City, State (County) Carmel, IN 46032   (Hamilton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $501,700 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of approximately 20 feet of 16-inch ductile iron water main by open cut installation, 2,165 feet of 16-inch HDPE water main by horizontal directional drill installation, along with related fittings, hydrants valves, pavement repair, appurtenances, and other incidental work necessary for a complete installation. Bid Bond in the amount of ten percent (10%) of the total Bid amount, including alternates with a satisfactory corporate surety or by a certified check on a solvent bank in the amount of ten percent (10%) of the amount of the Bid. The Bid Bond or certified check shall be evidence of good faith that the successful Bidder will execute within fifteen (15) calendar days from the acceptance of the Bid, the Agreement as included in the Bidding Documents. The Bid Bond or certified check shall be made payable to the Owner. Any Bid may be withdrawn prior to the scheduled closing time for receipt of Bids, but no bidder shall withdraw his Bid within ninety (90) days after the actual opening of the Bids. All Bid Bonds and certified checks of unsuccessful bidders will be returned by the Owner upon selection of the successful Bidder and execution of the Agreement, and provision of the required Performance Bond and Payment Bond. Award will be made to the low, responsive, responsible bidder. The successful Contractor will be required to enroll in and verify the work eligibility status of all employees hired after the date of this Contract through the E-Verify program. The Contractor will also be required to sign an affidavit concerning employment of unauthorized aliens. A copy of the affidavit is included in the Bid Documents. A Performance Bond with a good and sufficient surety, acceptable to the Owner and Engineer, shall be required of the successful Bidder in an amount equal to at least one hundred percent (100%) of the Contract Price, conditioned upon the faithful performance of the Agreement. The Contractor shall execute a Payment Bond to the Owner, approved by Owner and Engineer and for the benefit of the Owner, in an amount equal to one hundred percent (100%) of the Contract Price. The Payment Bond is binding on the Contractor, their subcontractor, and their successors and assigns for the payment of all indebtedness to a person for labor and services performed, material furnished, or services rendered. The Payment Bond must state that it is for the benefit of the subcontractors, laborers, material suppliers, and those performing services. The surety of the Payment Bond may not be released until one (1) year after the Owners final settlement with the Contractor. All out-of-state corporations must have a certificate of authority to do business in the State of Indiana. Application forms may be obtained by contacting the Secretary of State, State of Indiana, Statehouse, Indianapolis, Indiana 46204. Bidders on this work shall be required to comply with the provisions of the Presidents Executive Order No. 11246, as amended. The Bidders shall also comply with the requirements of 41 CFR Part 60 - 4 entitled Construction Contractors - Affirmative Action Requirements. A copy of 41 CFR Part 60 - 4 may be found in the Supplemental General Conditions of the Contract Documents and Specifications. The Bidders attention is also called to the Minority/Women Business Participation requirements contained in the Project Specifications. Contract procurement is subject to the federal regulations contained in the OMB Circular A-102, Sections B and O and the State of Indiana requirements contained in IC-36-1-9 and IC-36-1-12. Bidders are notified that there is a 7% MBE and 5% WBE participation goal on this project. The Owner reserves the right to reject and/or cancel any and all Bids, solicitations and/or offers in whole or in part as specified in the solicitation when it is not in the best interests of the governmental body as determined by the purchasing agency in accordance with IC 5-22-18-2. The Owner also reserves the right to waive irregularities in any Bid, and to accept any Bid which is deemed most favorable to the Owner.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents