Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Convert Existing Basketball Courts to Four Pickleball Courts at Blackwell Park Everitts Road
Infrastructure
Design
$200,000 CJ est. value
East Amwell Township, NJ 08551

Swan Creek Tributary Stabilization and Restoration Project and Tropical Storm Ida Restoration Projects for Swan Creek and Quarry Street
Infrastructure
Bidding
$160,000 CJ est. value
Lambertville, NJ 08530

Swan Creek Tributary Stabilization and Restoration Project and Tropical Storm Ida Restoration Projects for Swan Creek and Quarry Street
Infrastructure
Bidding
$160,000 CJ est. value
Lambertville, NJ 08530

Road Material
Term Contract
Sub-Bidding
Lebanon, NJ 08833

Street Maintenance Snow and Ice Removal Services, Salt/Sand Spreading
Post-Bid

T0731 Roadside Maintenance Herbicides and Insecticides - Statewide
Term Contract
Post-Bid

Route 78, Rockfall Mitigation
Results
$20,000,001 to $50,000,000 est. value
NJ

Roadway Resurfacing Milepost 83 to 122 Section 19 and 20
Results
$20,000,000 to $40,000,000 est. value

Runway 4-22 Rehabilitation Project
Term Contract
Construction
$1,800,000 est. value
Whitehouse Station, NJ 08889

Rosedale and Rosehill Cemetery
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Readington Township, NJ 08889

Main Treatment Plant Access Road Full Depth Reclamation Paving
Infrastructure
Bidding
$2,000,000 CJ est. value
Flemington, NJ 08822

Providing All Excavation and Repair Services
Term Contract, Infrastructure
Post-Bid
High Bridge, NJ

Washington Avenue Improvement Project Section III and River Road Improvement Project Section I
Results
$332,758 est. value
High Bridge, NJ 08829

Tropical Storm IDA Restoration Projects for Various Roadways
Infrastructure
Bidding
$1,000,000 CJ est. value
Lambertville, NJ 08530

Last Updated 08/11/2022 05:33 PM
Project Title

Road Resurfacing Project for Stonebridge Road and Wolfs Farm Road

Physical Address View project details and contacts
City, State (County) Union Township, NJ 08827   (Hunterdon County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

ROAD RESURFACING PROJECT FOR STONEBRIDGE ROAD & WOLF'S FARM ROAD: The major construction items include approximately: 14,970 SY HMA Surface Milling, 3" or less; 900 SY HMA Milling, more than 3" to 6"; 2,250 Tons HMA 9.5M64 Surface Course (2.5-inch thickness); 270 Tons HMA 19M64 Base Course, 5-inch thickness; 10,790 LF Curb Sealant and other incidental work appurtenant thereto. Bids must be made on standard proposal forms provided in the Bid Package in the manner designated therein, and required by the Specifications, must be enclosed in sealed envelopes, bearing the name and address of the bidder and the name of the project on the outside, addressed to the Township of Union, 140 Perryville Road, Hampton, NJ 08827, and must be accompanied by a Non-Collusion Affidavit with either a Bid Bond or Certified Check for not less than ten percent (10%) of the amount bid, providing said check or bid bond need not be more than $20,000.00 nor shall not be less than $500.00, and such other documents and certifications as required in the Bid Package, and be delivered at the place on or before the hour named above. Bidders are required to comply with the requirements of N.J.S.A.10:5-31 et seq. and N.J.A.C.17:27 et seq. Bidders are also required to conform to all provisions of the Local Public Contracts Law and the Prevailing Wage Act. The Union Township Mayor and Committee reserves the right to reject any or all bids and to waive any informality in any bid inuring to the benefit of the Township of Union. The completion time for this project shall be 20 working days as follows: Begin Contract Period 10 days after award of Contract Complete All Contract Construction 20 working days after beginning of Contract Period

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents