Similar Projects
Olin Park Building Improvements
Renovation
Bidding
$3,350,000 est. value
Madison, WI 53715

McPike Skate Park Crack Repair
Infrastructure
Bidding
Madison, WI 53703

Rotary Park Improvements
Post-Bid
Stoughton, WI

Orfan Park Tennis Court and Basketball Court Resurfacing Project
Post-Bid
Less than $50,000 est. value
Sun Prairie, WI 53590

Playground Replacements at Sunny Valley and Hunter's Ridge Parks
Results
Less than $90,000 est. value
Sun Prairie, WI 53590

Fireman's Park Splashpad
Results
De Forest, WI

The Boneyard
New Construction - 2,400 SF
Construction
$500,000 to $1,000,000 CJ est. value
Madison, WI

Birkinbine, Grandview, Reserve and West Prairie Village Parks Playground Project
Post-Bid
$280,000 est. value
Sun Prairie, WI 53590

Sheehan Park Concrete Skate Park Addition
Addition - 4,600 SF
Results
Less than $275,000 est. value
Sun Prairie, WI 53590

Aldo Leopold Park Pump Track
New Construction
Post-Bid
$250,000 est. value
Madison, WI 53713

Grading and Paving of Concessions Area and Stormwater
Results
$150,000 to $175,000 est. value
Middleton, WI 53562

PlayGround Components
Post-Bid
Cottage Grove, WI 53527

Wetmore Park Splashpad and Playground
Results
Less than $1,000,000 est. value
Sun Prairie, WI 53590

Park Paving 2021
New Construction, Infrastructure
Post-Bid
$562,021 est. value
Madison, WI

Stone Bridge Park Improvements
Results
Monona, WI 53716

Last Updated 07/23/2021 08:44 AM
Project Title

Playground Design at Sunnybrook Park

Physical Address View project details and contacts
City, State (County) De Forest, WI   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $55,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Playground shall meet all CPSC and ASTM safety guidelines 2. Playground shall meet all ADA regulations for playground equipment 3. Proposal shall have separate areas for 2 5 and 5 - 12 year olds 4. 70% of play equipment budget shall be directed toward 5-12 year play value. The 5-12 play structure shall be ramped. 5. 30% of play equipment budget shall be directed toward 2-5 year play value. 6. Approximately 40% of overall play feature budget to be focused on ADA accessibility and inclusive play design. 7. Playground must include a swing set 10’ high for 2 belt swings and a separate 8’ high swing set with 2 baby seats and 1 ADA swing package. Consider adding a double swing for adult and toddler to swing together. 8. Play design should balance physical, sensory, and social benefits. 9. 12” depth of engineered ASTM Certified Playground Wood Mulch Surface for playground and swing area. 10. Total budget including supply and installation of equipment and surfacing not to exceed $55,000.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents