Similar Projects
East Substation Transmission Upgrades - City of Pella
Infrastructure
Conception
$360,000 CJ est. value
Pella, IA 50219

East Substation Transmission Upgrades - City of Pella
Infrastructure
Conception
$360,000 CJ est. value
Pella, IA 50219

W. Washington Street and Fifield Road Intersection Improvements
Infrastructure
Design
$291,255 CJ est. value
Pella, IA 50219

Knoxville Hospital & Clinics Emergency Department Expansion
Addition, New Construction, Infrastructure
Design
$21,000,000 CJ est. value
Knoxville, IA 50138

Parking Improvements Pella Corporation
Infrastructure
Bidding
$339,015 CJ est. value
Pella, IA 50219

HMA Joint and Crack Sealing - Iowa 5
Infrastructure
Bidding
$80,000 CJ est. value
Knoxville, IA 50138

RFQ D/B - 2-Phase Design-Build for Lake Red Rock and Saylorville Lake Administrative, Visitor Center and Maintenance Buildings
New Construction, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Knoxville, IA 50138

2022 Sidewalk Repair Program
Infrastructure
Post-Bid
$600,000 CJ est. value
Pella, IA 50219

University Street and 8th Street Improvements
Infrastructure
Results
$986,390 CJ est. value
Pella, IA 50219

Melcher-dallas Community School District Gymnasium Addition - Rebid
Addition, Demolition, Infrastructure
Results
$8,793,550 CJ est. value
Melcher Dal, IA 50163

Pella Corporation Airport Hangar Addition
Addition, Demolition, Infrastructure - 2,800 SF
Pending Verification
$3,000,000 CJ est. value
Pella, IA 50219

Old 163 Storage
New Construction, Infrastructure
Pending Verification
$5,500,000 CJ est. value
Pella, IA 50219

Idaho Drive Underground Conversion - City of Pella
Infrastructure
Conception
$350,000 CJ est. value
Pella, IA 50219

Pella Community School District - Early Childhood Center Early Sitework - Bid Package #31 - Grading Bid Package #32 - Concrete Paving
Infrastructure
Results
Pella, IA 50219

Southside Beautification - 201.5.09.7236.6799 - City of Pella
New Construction, Infrastructure
Conception
$729,000 CJ est. value
Pella, IA 50219

Last Updated 06/01/2023 03:42 PM
Project Title

North Plant to East Substation Bus Tie - City of Pella

Physical Address View project details and contacts
City, State (County) Pella, IA 50219   (Marion County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $660,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the installation of parallel 750 kcmil 3-phase copper cables from North Plant Sub to East Sub by way of existing duct banks along E 1st St and newly constructed from Sub C (retired) to East Sub. With this improvement, we gain the ability to back up our largest loads on the east side of town with two separate central substations, North Plant and Clark. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of June 1, 2023, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents