Similar Projects
Wastewater Treatment Plant 3 Phase 1 0.25 MGD
New Construction
Bidding
Farmersville, TX

Lift Station and Waste Water Treatment Plant Site Improvements to Serve Oxford Place Phase 1
Alteration
Post-Bid
McKinney, TX

Offsite Lift Station Improvements for Venetian at Weston
Renovation
Post-Bid
TX

Custer Road Pump Station Meter Vault Relocation
Results
$3,454,363 est. value
Prosper, TX 75078

Office Booster Pump Project
Results
Wylie, TX 75098

Reuse Pump Station Improvements
Results
$10,000,000 to $14,000,000 est. value
Frisco, TX

Pump Repairs and Pumping Station Services
Results
$65,000 est. value
Allen, TX

Construction of Stonebridge Lift Station Phase I Improvements
New Construction
Results
$835,000 est. value
McKinney, TX

Bear Creek SUD Pump Station 2 Improvements
Results
Lavon, TX 75166

CR 596 Pump Station Project
Results
$2,880,100 est. value
Josephine, TX 75164

North McKinney Transfer Lift Station Project and North McKinney Transfer Force Main Project - Phase 1 and 2 Improvements
Infrastructure
Results
$70,000,000 to $95,000,000 est. value
McKinney, TX

High Point Lift Station Improvements
Renovation
Results
$325,000 est. value
Celina, TX 75009

McKinney Ranch Pump Station Improvements Project
Renovation
Results
$13,500,000 est. value
McKinney, TX 75070

Stacy Road Pump Station 1 Rehabilitation
Renovation
Results
$3,500,000 est. value
Allen, TX 75013

Upper East Fork Interceptor System Sloan Creek Lift Station
New Construction
Results
$9,000,000 est. value
Fairview, TX

Last Updated 03/29/2022 08:21 AM
Project Title

Sunset Boulevard Lift Station

Physical Address View project details and contacts
City, State (County) Celina, TX   (Collin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,375,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing a 1-MGD lift station, including yard piping, site improvements, odor control, and electrical/SCADA improvements. The project also includes the construction of a temporary road and 12-inch water line, along the future Sunset Boulevard eastbound lanes alignment from the lift station to Oklahoma Drive, including the box culverts required at the Doe Branch creek crossing.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents