Similar Projects
Annual Contract/Painting and Weatherproofing
Term Contract
Bidding
FL

JIA Parking Garage Walkway Enclosure Replacement (PedEx Enclosure Mods)
Bidding
Jacksonville, FL

Palm Beach County Sheriff's Office Exterior Hardening
Post-Bid
West Palm Beach, FL

CM-at-Risk Services - Architecture Building Exterior Envelope Repair
Post-Bid
Less than $5,000,000 est. value
Gainesville, FL

40 - Year Repairs for Aquatic Complex, City Hall and Wastewater Plant
Results
Less than $700,000 est. value
Fort Lauderdale, FL

TGK Facility Re-Roof - Pressure Wash and Seal Exterior Building
Results
Less than $3,350,000 est. value
FL

UCF Downtown/Dr. Phillips Academic Commons
Construction
$66,000,000 est. value
FL

Lee County Downtown Jail Corridor Ceiling Replacement
Construction
Fort Myers, FL 33901

Solar Panel and Awning Fabrication, Installation and Financing
Bidding
Winter Park, FL

54--Building Roof Top Guardrail System
Post-Bid
Panama City, FL 32407

Facility Maintenance Services for Cecil Airport
Results
Jacksonville, FL 32221

Provide Waterproofing, Exterior and Interior Painting
Bidding
FL

Awning Repair, Recover and Install
Post-Bid
Less than $25,000 est. value
Sarasota, FL 34235

Grassy Waters Preserve Handrail Replacement
Results
Less than $180,000 est. value
West Palm Beach, FL 33412

TTO Traffic Department
Bidding
FL

Last Updated 04/28/2021 06:37 AM
Project Title

Portable Building Ramp and Stair Handrails

Physical Address View project details and contacts
City, State (County) FL   (Alachua County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Full-service contract for the fabrication and installation of steel handrails on modular building (“portable”) ramps and stairs at various sites throughout the District. The District currently maintains approximately 320 modular buildings at 42 locations.

Details

Division 05 - Metals, Metal Stairs, Metal Walkways, Metal Ramps.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents