Similar Projects
FY21 Dock Repair - Apostle Islands National Lakeshore
Design
$500,000 to $1,000,000 est. value
Bayfield, WI

St. Croix Shores Boathouse - Stairs
Design
$500,000 to $1,000,000 est. value
Saint Croix Falls, WI 54024

Dike Surface Repairs
Bidding
$50,000 est. value
Whitewater, WI 53190

J--Dock Repair
Post-Bid
$250,000 to $500,000 est. value
Bayfield, WI

126' Aluminum Truss Dock
Post-Bid
Scandinavia, WI 54977

Boat Launch Repair
Results
Less than $360,000 est. value
Madison, WI 53703

Cotton Mill Park Fishing Platforms and Kayak Launch
Addition
Results
Beaver Dam, WI 53916

Seasonal Removal and Installation of Dock
Post-Bid
De Soto, WI 54624

Courtesy Dock and Ramp
Results
Prescott, WI 54021

Pewaukee Lake Boat Launch Reconstruction
Post-Bid
Pewaukee, WI 53072

Instrumentation for Prestressing Miter Gate Diagonals - Lock & Dam 4
Results
Alma, WI 54610

Fountain City Service Base Phase II Design Build
Post-Bid
Fountain City, WI

Pine Lake Boat Launch Access Improvements
Results
Chenequa, WI

Boat Landing Improvements
Post-Bid
Wauzeka, WI

Pier 1 Water and Decking
Results
Washburn, WI 54891

Last Updated 04/13/2021 10:35 AM
Project Title

Boat Launch Improvements

Physical Address View project details and contacts
City, State (County) Fountain City, WI 54629   (Buffalo County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $475,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of the removal of an existing parking lot, utilities, and two boat launches; constructing an expanded improved upper boat launch at Merrick State Park that includes additional truck / trailer parking stalls, replacing the boat ramp, replacing the pier, and shifting and replacing the adjacent park access drive to facilitate these improvements. Additional improvements will be performed as a separate task for limited improvements at the lower boat launch at Merrick State Park including replacement of the boat ramp and limted pavement replacement as necessary to construct the new boat ramp.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents