Similar Projects
Loy Norrix High School - 2022 Bond - Kalamazoo Public Schools
Renovation
Conception
$5,000,000 est. value
Portage, MI 49002

Maple Streets Middle School - 2022 Bond - Kalamazoo Public Schools
Renovation
Conception
$2,000,000 est. value
Kalamazoo, MI 49008

New Career Technical Education Center
New Construction - 160,000 SF
Design
Kalamazoo, MI

Virtual School Portable Classrooms
Demolition, New Construction, Infrastructure
Design
$900,000 CJ est. value
Canadian Lakes, MI 49307

Bid Package #3 - L.E. White Middle School Tennis Court Renovation
Renovation
Bidding
$500,000 CJ est. value
Allegan, MI 49010

Jenison High School West Parking Lot Improvements
Infrastructure
Bidding
$220,000 CJ est. value
Georgetown Township, MI 49428

Anchor Bay School District - High School Additions
Addition, Renovation, Infrastructure - 27,000 SF
Sub-Bidding
$5,200,000 CJ est. value
Ira, MI 48023

Warren Consolidated Schools 2022 Bond Program Various Projects Bid Package #2
Renovation
Sub-Bidding
$1,500,000 CJ est. value
Warren, MI 48093

Unionville Sebewaing Area Schools - 2020 Bond Project
Results
Sebewaing, MI

Southfield Public Schools High School ITC Facility
Results
Southfield, MI 48033

Okemos Public Schools 2022 Bond Program Bid Package No. 1 2023 Summer Renovations
Renovation
Construction
$4,266,025 CJ est. value
Meridian charter Township, MI 48864

Southfield High School Arts and Technology - 2022 Bond - Southfield Public School
Addition, Demolition, Renovation, Infrastructure
Conception
$57,350,000 CJ est. value
Southfield, MI 48033

Burgtorf Building - 2022 Bond - Kearsley Community Schools
Renovation
Design
$2,000,000 est. value
Flint, MI 48506

2022 Bond Construction Projects Asphalt Paving Rebid
Renovation, Infrastructure
Bidding
$1,105,203 CJ est. value
Hancock, MI 49930

Chippewa Valley Schools - BP 5D/E - Synthetic Turf D-Zone/Admin Building Emergency Generator
Renovation
Sub-Bidding
$300,000 CJ est. value
Clinton Township, MI 48036

Last Updated 08/17/2023 12:15 PM
Project Title

Clinton High School Addition Bid Package #4 - Rebid

Physical Address View project details and contacts
City, State (County) Clinton, MI 49236   (Lenawee County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Drawings remain the same, new spec book has been issued as of 1-11-2023. All questions regarding the bidding procedures, design, and drawing/specification intent are to be directed to the Construction Manager on a Clarification Request Form (Section 00310), attention Christopher Ice (cice@wolgast.com) and Judy Rauch (jrauch@wolgast.com). Bid Security A Bid Security by a qualified surety authorized to do business in the state where the Project is located and in the amount of five percent (5%) of the Base Bid shall accompany each proposal or proposal combination. The Bid Security may be in the form of a Bid Bond, Cashier's Check, or Money Order. Personal checks are NOT acceptable. Bids may not be withdrawn for a period of sixty (60) days after the bid date. Successful Bidders may be required to furnish Surety Bonds as stated in the Project Specifications (Section 00600). Familial Disclosure All bidders must provide familial disclosure in compliance with MCL 380.1267 and attach this information to the bid. The bid shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the Owner or the employee of the bidder and any member of the board, intermediate school board, or board of directors or the superintendent of the school district, intermediate superintendent of the intermediate school district, or chief executive officer of the public school academy. The District shall not accept a bid that does not include this sworn and notarized disclosure statement. Iran Business Relationship Affidavit All bidders must provide a signed Iran Business Relationship Affidavit. Effective April 1, 2013 all bids, proposals, and/or qualifications statements received in the State of Michigan must comply with the Iran Economic Sanctions Act, 2012 P.A. 517. The District shall not accept a bid that does not include this signed affidavit. Owners' Rights The Owner reserves the right to reject any or all proposals, accept a bid other than the low bid, and to waive informalities, irregularities, and/or errors in the bid proposals, which they feel to be in their own best interest. Addendum #1-#2 have been issued as of 12-16-2022. Start Date: March 2023 Completion Date: September 2024 Unloading, protection and record of all hollow metal doors and frames. 2. All wood nailers for roof blocking, fascia, masonry, etc. 3. Wood blocking around windows and doors. 4. All temporary shoring as required for work in this Bid Division. 5. Provide, receive, store, protect, inventory, and install all described bid items. 6. Submittal of required product data and shop drawings within two (2) weeks of Construction Contract or Owner's Letter of Intent. 7. Provide for proper legal off-site disposal off all construction debris generated by the described work. 8. Sufficient numbers of shop drawings are to be provided to the affected contractors (i.e. mason, electrician, etc.) 9. Provide wood base for lockers, if required. 10. Remove items indicated: clean, service and otherwise prepare them for reuse; store and protect against damage. Reinstall items in the same locations or in locations indicated. 11. Remove and legally dispose of items not indicated to be reinstalled, salvaged or to remain the Owner's property. 12. Install all doorframes, and coordinate with mason contractor. 13. Cover all countertops with double layered corrugated cardboard. 14. Clean and dust all casework upon completion. 15. Clean, prep and adjust all equipment immediately prior to Owner occupancy. 16. Patch walls after removal of existing tack strips and tack boards that are not covered by new strips or boards. Walls shall be brought to a surface ready to receive new paint. Review the milestone schedules. This bid division's work will be required to be completed at multiple locations and concurrently for some of the work. Prepare your bid proposal accordingly to allow for sufficient manpower and resources. 2. Provide all flooring removal including all adhesive and thin set. Includes all grinding in order to achieve a clean slab ready for new finishes. 3. Provide all selective interior demolition as shown on the complete set of construction drawings. 4. Furnish and install all blocking and sheathing as required, including fire-rated and treated as documented. 5. Furnish and install all hollow metal frames (except installation of hollow metal frames in new masonry work by masonry contractor) and doors, wood doors and finish hardware for these doors. 6. Provide all hollow metal frames to the masonry contractor prior to the installation of any masonry walls that have hollow metal frames installed in them. 7. Furnish and install all joint sealants and fire stopping as indicated in specifications and drawings including but not limited to perimeter joints of hollow metal door frames. Verify installation of caulking is approved by construction manager after the first door frame is caulked to set level of acceptance for all required work. Poor caulking installation will be required to be removed and reinstalled. 8. Furnish and install all wood doors and hardware for wood doors. 9. Furnish and install all toilet partitions, urinal screens, toilet accessories and all stainless steel framed mirrors. 10. Furnish and install slat wall systems as indicated on drawings. 11. Furnish and install the metal coiling doors. 12. Furnish and install the roller window shades. 13. Furnish and install all marker and tackboards. 14. Furnish and install all signs and dimensional lettering. 15. Furnish and install all folding panel partitions. 16. Furnish and install all visual display cases and boards. 17. Furnish and install all fire extinguishers and cabinets. 18. Furnish and install treated wood blocking and wood trim at locker bases. 19. Furnish and install hardwood maple benchtops with a clear acrylic resin finish as shown on architectural drawings. Addendum #1-#2 have been issued as of 1-20-2023.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents