Similar Projects
Galesburg Watermain Replacement
Infrastructure
Bidding
$3,000,000 CJ est. value
Galesburg, ND 58035

Sundre Well F Connection Pipeline and Access Road
Infrastructure, Renovation
Post-Bid
$380,000 CJ est. value
Minot, ND 58701

LS 49 and Forcemain
New Construction, Infrastructure
Post-Bid
$4,100,000 CJ est. value
Grand Forks, ND 58201

Fargo PVC Air Line Replace With Aluminum
Results
West Fargo, ND

CRWD - NDSP Pipeline Improvements
Infrastructure
Results
$11,594,000 CJ est. value
Kindred, ND 58051

Altru South Campus Hospital Expansion
New Construction, Renovation - 528,000 SF
Construction
$380,000,000 est. value
Grand Forks, ND 58201

New Utility Construction (SS Lift Station 53 Force Main)
Infrastructure
Post-Bid
$787,055 CJ est. value
Fargo, ND 58102

2022 Lagoon Repairs
Infrastructure
Results
$338,948 CJ est. value
Surrey, ND 58785

Prairie Skies First Addition
Infrastructure
Post-Bid
$950,000 CJ est. value
Casselton, ND 58012

2022 Fairgrounds Trunk 36-Inch Sewer Repair
Infrastructure
Results
$163,158 CJ est. value
Minot, ND 58701

Paving Improvement
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Valley City, ND 58072

Sanitary Sewer Improvement District 2022
Infrastructure
Results
$2,664,568 CJ est. value
Ashley, ND 58413

2021 System Improvements Phase 2 - WTP
Renovation, Infrastructure
Post-Bid
$300,000 CJ est. value
Turtle Lake, ND 58575

New Town WTP Filter Box Repairs
Renovation, Infrastructure
Results
$114,000 CJ est. value
New Town, ND 58763

Sanitary Sewer Improvements
Infrastructure
Post-Bid
$225,000 CJ est. value
Dazey, ND 58429

Last Updated 06/06/2023 04:33 AM
Project Title

AWUD - User & Transmission Expansion Phase 2

Physical Address View project details and contacts
City, State (County) Gilby, ND 58235   (Grand Forks County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $336,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Separate sealed Bids for construction of the AWUD - User & Transmission Expansion Phase 2 Project; The Work is comprised of two (2) Contracts, each with two (2) Base Bids and three (3) Bid Alternates. Only one contract will be awarded. Contracts No. 1 or No. 2 will award the Base Bids with or without any combination of the alternates; Alternates with an 'A' or a 'B' option will only award the 'A' or the 'B' option if the corresponding alternate is accepted for award. All bids shall be contained in a sealed envelope plainly marked showing that such envelope contains a Bid for the Project. Also refer to Section 00 21 13 for preparation of bid information. All Bids shall be prepared according to the Instructions to Bidders contained within the Project Manual. Each Bid shall be accompanied by a separate envelope containing a Bid Security in the form of a Bidder's Bond executed by the Bidder as principal and by a surety company authorized to do business in the State of North Dakota, payable to the Agassiz Water Users District, in a sum equal to five percent (5%) of the full amount of the Bid. The surety must be listed as a certified surety in the U.S Department of the Treasury's Circular 570A. A certified check in lieu of a surety company in the amount of 5% of the total project cost will not be accepted. This is to serve as a guarantee that the successful Bidder will enter into a Contract within ten (10) days of Notice of Award, in accordance with the terms of the principal's Bid and Contractor's Bond as required by law and regulations and determinations of Agassiz Water Users District for the performances of such Work. Only Bids that are accompanied by such a Bond will be considered. Bidders must be licensed for the full amount of the Bid as required by North Dakota Century Code 43-07-05. Each Bid shall contain a copy of the Contractor's license or certificate of renewal thereof issued by the Secretary of State. All Bids must be submitted on the Bid Form furnished by the Engineer. No Bid will be read or considered that does not fully comply with the above provisions and other provisions contained within the Bidding Documents, and any deficient Bid submitted will be returned to the Bidder unopened. Each Bidder must possess a valid North Dakota contractor's license for the full amount of their bid, as required by N.D.C.C. 43-07-07. Each bid must be accompanied by a copy of the Bidder's Contractor's License or Certificate of Renewal, issued by the North Dakota Secretary of State, and each license must be valid and dated at least 10 days prior to the date set for bid opening, as required under N.D.C.C. 43-07-12. The District will not read or consider any bid that does not include a proper Bidder's bond and contractor's license or renewal, as described above, and does not otherwise fully comply with the requirements of N.D.C.C. 48-01.2-05. Bidders on this Work will be required to comply with the Presidential Executive Order No. 11246, as amended. The requirements for Bidders and Contractors under this order include EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION REQUIREMENTS, DAVISBACON WAGE RATE REQUIREMENTS, and AMERICAN IRON AND STEEL REQUIREMENTS as explained in the Specifications. Bidders on this work will be required to comply with Title 40 CFR Part 33 - Participate by Disadvantaged Business Enterprises in the United States Environmental Protection Agency Programs. The requirements for bidders and contractors under this regulation concern utilization of Minority Business Enterprises (MBE), Women's Business Enterprises (WBE), and Small Business Enterprises (SBE) and are explained in the specifications. The goal for MBE is 2% of the total dollar value of the project. The goal for WBE is 3% of the total dollar value of the project. Bidders shall demonstrate a good faith effort to solicit for MBE and WBE subcontractors. The completed MBE/WBE Solicitation Information sheet must be provided in the outer bid security envelope. Failure to include this information will result in the bid not being opened. All Bids will be made on the basis of cash payment for such work. After Bid opening, the Owner will return Bid security of all except the three lowest responsible Bidders. When the Contract is awarded, the remaining unsuccessful Bidder's Bonds will be returned. The Owner reserves the right to reject any or all Bids, and further reserves the right to award the Contract in the best interests of the Owner. The Owner reserves the right to hold the three (3) low Bids for a period of sixty (60) days after the date of the Bid opening to complete financial arrangements

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents