Similar Projects
Airport Airfield, Terminals, Ground Access Infrastructure
Renovation, Alteration
Conception
San Antonio, TX

Clark High School - Fine Arts Replacement- 2022 Bond - Northside Independent School District
New Construction, Renovation, Infrastructure
Conception
$56,900,000 CJ est. value
San Antonio, TX 78249

Burbank High School - 2020 Bond - Category 2 - San Antonio Independent School District (SAISD)
New Construction, Renovation, Infrastructure
Design
$19,318,760 CJ est. value
San Antonio, TX 78205

SOFTBALL FIELD UPGRADE
Infrastructure
Design
$300,000 CJ est. value
San Antonio, TX 78224

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2018 Street Bond Projects - Phase II
Infrastructure
Post-Bid
$1,900,000 CJ est. value
Kirby, TX 78219

Emergency Response Road Improvment (Perimeter Road Package 4) (San Antonio International Airport)
Infrastructure - 109,555 SF
Results
$2,325,718 CJ est. value
San Antonio, TX 78223

Emergency Response Road Improvment (Perimeter Road Package 4) (San Antonio International Airport)
Infrastructure - 109,555 SF
Results
$2,325,718 CJ est. value
San Antonio, TX 78223

Package 2 SAWS NE Operation Center and NE Service Center
New Construction, Infrastructure
Construction
$250,000 CJ est. value
San Antonio, TX 78205

Refuel / San Antonio
New Construction, Infrastructure - 4,769 SF
Construction
$1,400,000 CJ est. value
San Antonio, TX 78254

Alamo Visitor Center and Museum
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
San Antonio, TX 78205

Alamo Visitor Center and Museum
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
San Antonio, TX 78205

Roof Top Unit Replacements (5 sites) - 2022 Bond - Northside Independent School District
Infrastructure
Conception
$9,400,000 CJ est. value
San Antonio, TX 78205

RCCG Salvation Center San Antonio / 1406 Pinn Road
New Construction, Infrastructure - 30,700 SF
Design
$2,500,000 CJ est. value
San Antonio, TX 78227

Legacy Traditional Schools, Kelley Campus Tenant Improvement
Infrastructure, Renovation - 28,000 SF
Post-Bid
$2,500,000 CJ est. value
San Antonio, TX 78216

Last Updated 10/11/2023 11:18 AM
Project Title

2024 TOC for Flatwork and Street Improvements Package 1

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78205   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $4,498,482 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of October 11, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** To place flatwork Task Orders to complete IMP sidewalk projects from the council approved FY24 IMP lists, from the FY24 NAMP program, and to support remote ramp construction for the FY24 SMP microsurface projects. The likely elements of flatwork construction for IMP sidewalk and NAMP projects include placement of new sidewalks (with or without removal of existing), placement of new driveway approaches which are not ADA-complaint (with removal of old), and restoration of the sites with backfill/topsoil/sod. Ancillary activities (that are required to produce a complete and usable project) may include replacement of existing curb, removal and replacement of mailboxes, removal of trees, and maintenance of existing area signs (upgrade of poles/remove & replace, etc), and placement of back-curb or retaining wall. Minimal asphalt activities include curb patch and small areas of asphalt improvement necessary to place curb/sidewalk. Remote ramp placement/upgrade is a stand-alone, all inclusive item that is used to support pavement projects where the ADA ramp is required to be placed/restored. Question Deadline 07/20/2023 at 4:00 PM CT

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents