Similar Projects
HVAC Improvements and Upgrades
Post-Bid

Kitchen Hood Cleaning
Term Contract
Post-Bid
Athens, OH 45701

HVAC Maintenance Services
Results

OU Konneker Research Ridges 25 HVAC and Boiler System Upgrades
Results
Athens, OH 45701

HVAC and Mechanical Products
Term Contract
Post-Bid

Campus Steam System Repairs 2020
Results
Less than $525,000 est. value
Athens, OH 45701

Beacon Schools Gym HVAC Renovation
Results
Less than $242,000 est. value
Athens, OH 45701

Gamertsfelder Hall Improvements
Renovation
Results
Less than $6,300,000 est. value
Athens, OH 45701

HVAC Controls Project
Results
Stewart, OH 45778

Washington Hall Make Up Air and Chilled Water
Results
$875,000 est. value
Athens, OH 45701

James Hall HVAC Renovation
Results
Athens, OH 45701

Morton Chilled Water Connection 2019
Results
Less than $410,000 est. value
Athens, OH 45701

HVAC Improvements 2020 Project for Tri-County Career Center
Results
$340,000 est. value
Nelsonville, OH 45764

OU Alden Library Air Handler Replacement Upgrades
Results
Less than $700,000 est. value
Athens, OH 45701

Portable Light Plants and Tow-Behind Air Compressors
Term Contract
Results

Last Updated 11/18/2020 08:05 AM
Project Title

Alden Chilled Water Tie-In 2020

Physical Address View project details and contacts
City, State (County) Athens, OH 45701   (Athens County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

HVAC, Electrical, and Hazardous Material Abatement $ 700,000 Alternate H-1 Demolition Chillers CH-1 and CH-2 $ 80,000 Alternate H-2 Demolish Cooling Tower $ 60,000 Alternate H-3 New Heating and Cooling Coils for AH-3 and AH-4 $ 110,000 1. Demolition Scope: a. Remove pumps and piping as shown b. Remove chillers and cooling towers per Alternates c. Replace cooling and heating coils in AHU-3 &AHU-4 per Alternate d. Protect ceiling of Library stack area when removing for piping access. (ceiling to be re-installed at completion of piping work) 2. New Construction Scope: a. Underground chilled water lines from University Terrace to southwest corner of Alden Library b. Chilled Water piping inside Alden Library to mechanical room c. New pumps and VFDs d. New flow meters and energy meters e. New controls and system integration f. Electrical connections to support new equipment and controls g. Alternate bids for chillers and cooling towers demolition h. Alternate bid for new work related to AHU-3 and AHU-4

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents