Last Updated | 11/18/2020 08:05 AM |
Project Title | Alden Chilled Water Tie-In 2020 |
Physical Address | View project details and contacts |
City, State (County) | Athens, OH 45701 (Athens County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $700,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | HVAC, Electrical, and Hazardous Material Abatement $ 700,000 Alternate H-1 Demolition Chillers CH-1 and CH-2 $ 80,000 Alternate H-2 Demolish Cooling Tower $ 60,000 Alternate H-3 New Heating and Cooling Coils for AH-3 and AH-4 $ 110,000 1. Demolition Scope: a. Remove pumps and piping as shown b. Remove chillers and cooling towers per Alternates c. Replace cooling and heating coils in AHU-3 &AHU-4 per Alternate d. Protect ceiling of Library stack area when removing for piping access. (ceiling to be re-installed at completion of piping work) 2. New Construction Scope: a. Underground chilled water lines from University Terrace to southwest corner of Alden Library b. Chilled Water piping inside Alden Library to mechanical room c. New pumps and VFDs d. New flow meters and energy meters e. New controls and system integration f. Electrical connections to support new equipment and controls g. Alternate bids for chillers and cooling towers demolition h. Alternate bid for new work related to AHU-3 and AHU-4 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |