Similar Projects
Renovation of Existing NeuroPsychiatric Center (NPC)
Renovation
Conception
$4,400,000 est. value
Houston, TX

Hanger Clinic
Renovation - 2,736 SF
Design
$245,000 est. value
Lubbock, TX 79407

Medical Clinic and Wellness Center
New Construction - 11,000 SF
Design
$2,000,000 est. value
Liberty, TX 77575

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Bissonnet Medical Plaza
New Construction - 52,825 SF
Construction
$9,800,000 est. value
Bellaire, TX 77401

Quest Diagnostics
Renovation - 1,300 SF
Construction
$90,000 est. value
Lake Worth, TX 76135

Methodist Midlothian Medical Center Main Canopy
Renovation - 2,640 SF
Pending Verification
$665,000 est. value
Midlothian, TX 76065

One Medical
Renovation - 5,715 SF
Pending Verification
$750,000 est. value
Houston, TX 77098

Next Level Urgent Care
Renovation - 2,602 SF
Design
$420,000 est. value
Lake Jackson, TX 77566

9401 Southwest Freeway Integrated Care Clinic Renovation
Renovation - 900 SF
Post-Bid
Houston, TX 77074

Cypress SurgiCenter
New Construction - 6,147 SF
Construction
$2,600,000 est. value
Houston, TX 77095

Texas Oncology - Waco
Renovation - 445 SF
Pending Verification
$200,000 est. value
Waco, TX 76712

John Sealy Modernization Phase III
Renovation
Design
$54,000,000 est. value
Galveston, TX 77555

Octapharma Plasma
Build-Out - 13,334 SF
Post-Bid
$2,000,000 est. value
Austin, TX 78745

Last Updated 06/08/2022 07:34 AM
Project Title

Mental Health Extended Observation Unit & Cris Residential Unit

Physical Address View project details and contacts
City, State (County) New Braunfels, TX   (Comal County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method Competitive Bids.
Project Status Schematic Drawings, Bidding Expected third quarter 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New Mental Health Extended Observation Unit/Crisis Residential Unit facility of approximately 15,000 square feet containing, but not limited to: 16 beds: 6 beds for extended observation treatment for involuntary commitments and 10 beds for crisis residential treatment for voluntary commitments. Exam/Interview Rooms. Group Treatment Room. Administrative Offices. Food – Catering Kitchen. Dining Room. Day Room. Laundry Facility. Nurses Station. Courtyard Area.

Details

Medical Office/Outpatient, 15,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents