Similar Projects
Chiller Replacement for Riverview Psychiatric Center
Alteration
Post-Bid
$700,000 est. value
Augusta, ME 04330

NMCC Christie HVAC Renovation
Alteration
Post-Bid
$650,000 to $750,000 est. value
Presque Isle, ME 04769

Repairs on The 2nd Floor Classrooms HVAC Fan Coil Units in Auburn, ME
Term Contract
Results
Auburn, ME 04210

Eddington Elementary School Indoor Air Quality Improvements Project
Alteration
Results
Eddington, ME 04428

Vine Street School - Heating System Project
Alteration
Post-Bid
Bangor, ME 04401

Heat Pumps for the Community Building
Alteration
Results
North Haven, ME

Installation of Heat Pump Systems
Alteration
Post-Bid
Portland, ME

Brownfield Community Center Heating System
Alteration
Results
Brownfield, ME 04010

Heat Pump with Installation
Alteration
Post-Bid
Alexander, ME

Portland International Jetport Air Handling Unit Replacement
Alteration
Results
$450,000 est. value
Portland, ME 04102

Katz Library HVAC Improvements
Alteration
Post-Bid
Augusta, ME 04330

MRRA TechPlace HVAC Improvements
Alteration
Results
Brunswick, ME

UMA Katz Library HVAC Upgrades
Alteration
Post-Bid
Augusta, ME 04330

HVAC, Ductwork and Ventilation Cleaning Services, Region 4 Central Lab
Alteration
Results
Bangor, ME

Piscataquis Community Elementary School - HVAC Upgrade
Alteration
Post-Bid
Guilford, ME 04443

Last Updated 04/10/2023 12:22 PM
Project Title

Cooling Tower Project at Mount View Complex

Physical Address View project details and contacts
City, State (County) Thorndike, ME 04986   (Waldo County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For the cooling tower project at Mount View Complex in Thorndike, Maine. This project is federally funded and all applicable requirements for a school must be adhered to. The project involves the replacement of the cooling tower with a new tower, including the installation of a stainless steel lower collection basin. Other work includes the disconnection of cooling tower piping and electrical, provision of a new replacement cooling tower, removal and disposal of the existing cooling tower, reconnection of power and supply/return piping, and start-up operation and performance testing. Bidders must include a detailed list of all proposed costs, timelines, proof of insurance, licensing information, and confirmation of compliance with the Davis Bacon Act. Bids should include a detailed plan for how the work will be completed. Contact information for the bidder should also be provided. The project completion date is August 30th, 2023. Interested parties may direct questions to RSU 3 at 207-948-6136.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents