Similar Projects
All Division Miscellaneous Substation Electrical Construction Services
Post-Bid
Colorado Springs, CO 80947

Replace T2a Transformer
Post-Bid
Colorado Springs, CO 80914

Transformer Alliance: Single and Three Phase Padmount, Overhead and Submersible
Term Contract
Results
Colorado Springs, CO 80947

UPS Battery Replacement and Installation
Results
Fort Carson, CO 80913

Weatherization Materials - Energy Resource Center
Term Contract, Alteration
Construction
Colorado Springs, CO 80903

Emergency Generator
Post-Bid
Colorado Springs, CO

Nixon ZD Switchgear
Results
Fountain, CO 80817

Airport Carport Solar Project
Post-Bid
Colorado Springs, CO 80947

Transformer (750KVA) Pad Mount Replacement and Installation
Results
Colorado Springs, CO 80914

Chestnut Security Lighting Upgrade
Alteration
Post-Bid
$215,000 est. value
Colorado Springs, CO 80907

Martin Drake Power Plant Temporary Natural Gas Generation
Results
CO

Peterson AFB Cat-6 Premise Wiring/Inside Plant Cabling
Term Contract
Post-Bid
Colorado Springs, CO

Electric Emergency Response / Reconstruction Services
Results
Colorado Springs, CO 80947

Drake Power Plant Temporary Natural Gas Generators - Electrical Contractor
Alteration
Post-Bid
Colorado Springs, CO

SECC Switchgear Replacement
Results
Colorado Springs, CO 80907

Last Updated 11/05/2021 06:40 AM
Project Title

SEP Nixon-Fountain 115Kv and Fountain-Bradley 115KV Transmission Reconductor D/B

Physical Address View project details and contacts
City, State (County) Fountain, CO 80817   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

• Construction of Nixon-Fountain 115kV and Fountain-Bradley 115kV line reconductoring projects including all management, supervision, labor, materials, tools, supplies, equipment, and all other necessary services needed to complete the work in a safe, timely and quality manner. • Coordination with Utilities’ staff on commissioning and integration into Utilities system

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents