Similar Projects
Walnut Street Replacement 3rd-7th - City of Rawlins
Alteration
Conception
$1,800,000 est. value
Rawlins, WY 82301

Two Rivers North Wind Farm
New Construction, Infrastructure
Conception
$540,000,000 CJ est. value
Medicine Bow, WY 82329

2022 Tennis Court Resurfacing
Infrastructure
Bidding
$40,000 CJ est. value
Rawlins, WY 82301

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Milling Plant Mix, Bituminous Pavement Surfacing, Chip Seal and Miscellaneous Work
Infrastructure
Post-Bid
WY

North Wilson Area Snow Removal Project (7-21-M)
Term Contract, Infrastructure
Results

District 1 Crack Seal
Infrastructure
Results

Lucky Star Wind Farm
New Construction, Infrastructure
Conception
$650,000,000 CJ est. value
Medicine Bow, WY 82329

Crack Sealing and Miscellaneous Work
Infrastructure
Post-Bid

Milling Plant Mix, Bituminous Pavement Surfacing (Recycle), High Performance Wearing Course, Bridge Rehabilitation and Miscellaneous
New Construction, Infrastructure
Results
WY

Rawlings to Laamie Wagonhound West I-80 Eastbound Lane - I804272 - Carbon County
Infrastructure
Conception
$6,457,000 CJ est. value
Rawlins, WY 82301

Z--MATOC - IMR Bridges
New Construction
Post-Bid
$10,000,000 est. value

Grading, Milling Plant Mix, Bituminous Pavement Surfacing (recycle), Chip Seal (overshoot), Bridge Rehabilitation and Miscellaneous Work
New Construction, Infrastructure
Results
WY

Laramie To Rawlins Dana Ridge Section Westbound Lane / I- 80 - I804275 - Carbon County
Infrastructure
Conception
$7,316,000 CJ est. value
Rawlins, WY 82301

Medicine Bow Roads Phase 2 Project
Infrastructure
Post-Bid
Medicine Bow, WY

Last Updated 10/01/2022 01:32 AM
Project Title

Baggs - Colorado State Line (Little Snake River South Section)

Physical Address View project details and contacts
City, State (County) Baggs, WY 82321   (Carbon County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Number: P182033 County: Carbon District: District 1 Bid Items Version#: 001 Work Type: Mill & Overlay, Seal Coat & Markings Bituminous surfacing, sidewalk, curb and gutter, bridge rehabilitation, traffic control, grading, milling, surfacing and miscellaneous work on approximately 4.00 miles on WYO 70 & WYO 789 at various locations between Baggs and the Colorado State Line. The Department of Transportation places the responsibility for the delivery of the bids to the letting with the bidder. Bidders may elect to have their bids delivered by any delivery service, or may hand carry their bids to the above street address. Any bids received at the letting after 9:00 AM on the above date will be returned to the bidders unopened. For questions regarding ICX bidding software, please contact Mark Janicek in the Contracts & Estimates office. Office number (307) 777-4214, Mobile: (307) 630-4727 (Available the day prior to and day of letting). In the event Mark is unavailable, please call: Contracts & Estimates. Office number: (307) 777-4487. The Wyoming Department of Transportation reserves the right to reject any and all bids. Each proposal must have a verified electronic bid bond number or be accompanied by a cashier's check, made payable to the TRANSPORTATION COMMISSION OF WYOMING in the minimum amount of ten (10) per cent of the contractor's bid. Bids on all projects in this letting will be received until the time previously specified in this invitation for bids and then will be opened and read. The order of opening bids will not necessarily be the same as projects are listed in the advertisement. Any contractor who is bidding on a project or projects may, upon written request, withdraw any or all of his other bids prior to the reading of subsequent bids. A time period will be allowed between the reading of bids on individual projects to permit contractors to submit a written request to withdraw bids. A contractor will be permitted to bid on work totaling more than his prequalification, providing that no one contract exceeds this approved amount, with the understanding that if he is apparent low bidder on work totaling the amount for which he is prequalified, less that amount of all outstanding work either as a prime or subcontractor, all other bids submitted by him may be rejected by the commission. No bid will be considered except from those contractors prequalified to bid in accordance with the rules and regulations issued by the Transportation Commission of Wyoming. All prospective bidders are requested to submit prequalification statements a minimum of two weeks in advance of the date of the letting as indicated in the prequalification instructions and requirements. The bids of contractors who are not prequalified as required prior to the time of opening bids will not be read or considered. The minimum rates of wages specified in the contract shall apply to all projects in this invitation and are set forth in the special provisions attached to the proposal form. The working hours on all interstate projects are subject to the Work Hours Act of 1962, PL 87-581 and implementing regulations, said act relates to and authorizes overtime work. Submission of proposals containing unbalanced bids on any items may be cause for rejection of the entire proposal. All proposal guaranties, except that of the lowest bidder, will be returned immediately following the opening and checking of the proposals. The proposal guaranty of the successful bidder will be returned after a satisfactory bond has been furnished and the contract has been executed. Bid bonds furnished as proposal guaranties will be returned only upon request. WYDOT - Call Order 007 - Baggs - Colorado State Line (Little Snake River South Section)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents