Similar Projects
Comprehensive Infrastructure for Tampa's Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

East Selmon Expressway Slip Ramps Design-Build
Design
Tampa, FL

Micro-Surfacing and Cape Seal
Infrastructure
Bidding
Tampa, FL

US 301 Bloomingdale
Post-Bid
FL

Forest Brooke Subdivision, Phase 3C and Collector Road 2nd Extension, Phase 1
Post-Bid
Wimauma, FL

Inspection, Management and Performance of I-4, I-275, I-75, I-375, and I-4 Connector in Hillsborough and Pinellas Counties
Results
Less than $39,856,572 est. value

Asphalt Pavement Widening/ Drainage Improvements/Sidewalk
Results
Less than $2,893,156 est. value
FL

I-75 MLK DDI
Post-Bid
FL

Montague Street at Memorial Highway Intersection Safety Improvements
Results
Less than $649,771 est. value
Tampa, FL 33601

CDBG Project for Streets Resurfacing
Post-Bid
Plant City, FL

Asphalt Milling Services with Davis-Bacon Act Requirements
Results
Less than $650,000 est. value
Tampa, FL 33601

Turkey Creek Road Project
Post-Bid
$3,000,000 est. value
Plant City, FL 33566

Hot Plant-Mixed Bituminous Courses
Results
Less than $1,620,000 est. value
FL

Villages N and P Infrastructure Construction Project
Post-Bid
Tampa, FL

Asphalt Repairs
Results
Less than $250,000 est. value

Last Updated 08/16/2021 06:20 AM
Project Title

Northwest (NW) County Intersection Improvements Group 5

Physical Address View project details and contacts
City, State (County) Tampa, FL   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,899,910
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To update two (2) existing intersections to improve safety and operations. The project is located at Sligh Avenue at Anderson Road and Old Memorial Highway at Montague Street. This project includes improving and expanding turning lanes and approaches as necessary, updating the intersections to current Florida Department of Transportation standards, including pedestrian and bicycle features.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents