Similar Projects
Spartanburg Community College - Central Campus Chiller #2 Replacement
Bidding
$500 to $550 est. value
Spartanburg, SC 29303

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

HVAC Services For Gleamns LIHEAP Program
Post-Bid

Robertson Hall Chiller
Results
$79,810 est. value
Spartanburg, SC

Removal and Replacement of HVAC System for Code Enforcement Office and Fire Station 4
Results
Spartanburg, SC

Statewide Indefinite Delivery Contract for Mechanical / Plumbing Construction Services
Post-Bid

Cleveland Park and Chesnee Community Center HVAC Replacements
Results
SC

Spartanburg - IDC 2019 - Mechanical Contracting
Post-Bid
$100,000 to $150,000 est. value
Spartanburg, SC

Chiller Maintenance Contract
Term Contract
Results
Spartanburg, SC

HVAC Maintenance and Repairs
Post-Bid
Spartanburg, SC 29304

HVAC Maintenance-Greenville
Results
Greenville, SC

HVAC Maintenance and Repair Services
Term Contract
Post-Bid
Less than $21,145,539 est. value
Spartanburg, SC 29303

HVAC Upgrades to Rainbow Lake Middle School
Results
Chesnee, SC

Tyger River CI - Replace HVAC Rooftop Units on Housing Units
Post-Bid
$1,500,000 to $1,600,000 est. value
Enoree, SC

Spartanburg County Existing Courthouse Jury Assembly Room HVAC Improvements
Results
Spartanburg, SC 29306

Last Updated 01/29/2019 12:03 PM
Project Title

Spartanburg County Existing Courthouse HVAC Improvements

Physical Address View project details and contacts
City, State (County) Spartanburg, SC 29306   (Spartanburg County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 1. Install new split system dedicated outdoor air equipment and associated low pressure insulated duct work and factory controls for Clerk of Court office area. 2. Install new electrical 225 amp 3 phase subpanel from new breaker in existing switch board. Install circuits for new dedicated outdoor air equipment from new 225 Amp subpanel. 3. Replace existing ceiling mount return air registers with filter grills and filters for selected existing fan coil units. Install specified air quality devices in existing fan coil units and air handling units as shown in construction documents. 4. Contractor to remove and lower the height of approximately 200 sq. ft. of lay-in ceiling. Provide required roof penetrations and protection in existing roof for new HVAC equipment as specified. 5. Owner to provide test and balance results and engineer site observations for contractor to make needed corrections to achieve specified performance of new and modified HVAC system.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents