Similar Projects
Upper Brays Bayou Greenway (BR 26) - Braeburn Glen Boulevard to Eldridge Parkway
Post-Bid
$11,100,000 to $12,500,000 est. value
Houston, TX 77074

Deer Park Hike and Bike Trails - Phase 1
Post-Bid
$400,000 est. value
Deer Park, TX

Waterline to Serve Lift Station No. 3 and Spring ISD
Results
TX

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

Katy Pointe Section 4 and 5 Amenities
Post-Bid
Cypress, TX

Intramural Gravel Lot Conversion
Results
Houston, TX 77204

Elyson, Section Thirty Seven Water, Sanitary Sewer, Storm Sewer Facilities, and Reinforced Concrete Paving
Post-Bid
TX

Elmside/Woodchase Path
Results
$2,900,000 to $3,300,000 est. value
Houston, TX 77042

Pipe, PVC, Schedule 80 Various Sizes
Post-Bid
Houston, TX

Silver Springs West Richey Road Dedication, Section One
Results
Less than $1,009,711 est. value
Houston, TX 77040

Generation Park - New Parking Lot
Post-Bid
$3,920,033 est. value
Houston, TX 77044

Water Distribution Sanitary Sewer and Drainage Facilities to Serve Telge Ranch Section 4
Results
TX

Imperial Forest Section 5
Post-Bid
Houston, TX

SWSP - Segment C
Results
$121,900,000 est. value
Houston, TX 77002

Greenbriar Station Paving Upgrades
Post-Bid
Houston, TX 77098

Reported 07/13/2022 11:08 AM
Project Title

Easthaven Boulevard (Bryant to Ledge) Drainage and Paving - M-000288 - City of Houston

Physical Address View project details and contacts
City, State (County) Houston, TX 77075   (Harris County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Schematic Drawings, Design Development, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will be located along Ledge and Nathaniel Streets and certain side streets to serve the Edgebook Developed area. As of July 12, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents