Similar Projects
Smithbridge Rd. Corridor(L)
Infrastructure
Conception
$2,895,000 CJ est. value
Chadds Ford, PA 19317

Smithbridge Rd. Corridor(L)
Infrastructure
Conception
$2,895,000 CJ est. value
Chadds Ford, PA 19317

Marshall Rd o/ Cobbs Creek
Infrastructure, Renovation
Design
$12,440,000 CJ est. value
Upper Darby, PA 19082

Marshall Rd o/ Cobbs Creek
Infrastructure, Renovation
Design
$12,440,000 CJ est. value
Upper Darby, PA 19082

Observatory Park Recreational Improvements
Infrastructure
Post-Bid
$500,000 CJ est. value
Darby, PA 19023

Demolition and Site Restoration of 304 Marks Avenue
Demolition, Infrastructure
Post-Bid
Darby, PA 19023

Newtown Township Line Restoration Projects
Infrastructure
Results
$53,026 CJ est. value
Newtown Square, PA 19073

Philadelphia & Delaware Valley Field Offices Micro Multiple Award (MAC)
New Construction
Results
$2,000 to $50,000,000 est. value

Villanova University - St Mary`s Hall Gymnasium Pool Infill
Construction
Villanova, PA 19085

Residence Inn by Marriott Hotel / Newtown Square
New Construction, Infrastructure - 26,613 SF
Pending Verification
$8,000,000 CJ est. value
Newtown Square, PA 19073

Estates at Coventry Woods Phase 2A
New Construction, Infrastructure
Pending Verification
$10,500,000 CJ est. value
Springfield, PA 19064

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

State Rd o/Darby Creek
Infrastructure, Renovation
Design
$9,020,000 CJ est. value
Media, PA 19063

Resurfacing of Certain Roads
Infrastructure
Post-Bid
Rose Valley, PA

Mckinley Park Tot Lot Site Improvements
Infrastructure
Results
Lansdowne, PA 19050

Last Updated 06/07/2023 04:13 PM
Project Title

675 Mass Timber

Physical Address View project details and contacts
City, State (County) Wayne, PA 19087   (Delaware County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 7, 2023, this project has been approved but is unable to break gorund until it lines up a tentant. A general contractor has been selected. Although a firm timeline for construction has not been determined, construction is not expected to begin before the fourth quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

5 Stories Above Grade, 145,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents