Similar Projects
SR 20/Tributary to Thornton Creek - Culvert Replacement
Infrastructure
Conception
$871,000 CJ est. value
Twisp, WA 98856

Omak Airport Water Reservoir
Infrastructure
Bidding
$300,000 CJ est. value
Omak, WA 98841

Omak Airport Water Reservoir
Infrastructure
Bidding
$300,000 CJ est. value
Omak, WA 98841

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Central Avenue ,Main Street Resurfacing and Deerpath ,Kay Water Main Improvements
Infrastructure
Results
$600,000 to $700,000 est. value
Oroville, WA

Armstrong Peel Smith Creek Watershed Water Quality Project 2022
Infrastructure
Construction
$4,000,000 CJ est. value
Nespelem, WA 99155

Armstrong Peel Smith Creek Watershed Water Quality Project 2022
Infrastructure
Construction
$4,000,000 CJ est. value
Nespelem, WA 99155

6th Street Improvements Project
Infrastructure
Bidding
$635,000 CJ est. value
Coulee Dam, WA 99116

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Post-Bid
$210,000,000 CJ est. value
Kirkland, WA 98033

Lower Pine Street Improvements
Infrastructure
Results
$330,000 est. value
Okanogan, WA

Central Landfill Phase 4 Development
Infrastructure
Bidding
$800,000 CJ est. value
Okanogan, WA 98840

Relocate Runway Connector and Construct West Taxilane
Infrastructure
Post-Bid
$436,000 est. value
Brewster, WA

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Last Updated 11/10/2022 07:09 AM
Project Title

Sealcoating Asphalt Resurfaces (Recreational Enclosure)

Physical Address View project details and contacts
City, State (County) Coulee Dam, WA 99116   (Okanogan County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Maintenance, Misc. Recreational, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Tribes anticipates the service period for this work to be for approximately 30 days. However, if the work extends beyond this period, and as stated in Section 2.12, any agreement would be require an agreed-upon modification to the term to continue. The Confederated Tribes of the Colville Reservation (Colville Tribes) seeks proposals from vendors to provide sealcoating asphalt resurface to our outdoor recreational enclosure for our inmates use at the Colville Tribal Correctional Facility located at 44 Schoolhouse Loop Road Nespelem, Washington 99155. The Confederated Tribes of the Colville Reservation is a Sovereign Nation. Presidential Executive Order established the Colville Indian Reservation in 1872, with a land base of 1.4 million aces, located in North Central Washington State. The Tribes' Indian Country now includes various off-reservation trust land holdings. The Tribes' administrative Headquarters are located at the Colville Indian Agency Campus, approximately 2 miles south of Nespelem, WA with offices located throughout our reservation. Tribal business hours are Monday thru Thursday 7:00 and 5:30 p.m. excluding Fridays, Saturdays, Sundays, Tribal and Federal holidays. This is a federally funded project and selected Contractor must comply with Davis-Bacon Act Wage Determination (prevailing wage) for Okanogan County. The Tribes reserves the right to reject any or all proposals, to waive any minor informalities or irregularities contained in any proposal, and to accept any proposal deemed to be in the best interest of the Tribes. Deadline for Questions: September 30, 2022 @ 3:00 PM PST Due to the weather this project is postponed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents