Similar Projects
Panther Creek Elementary Septic Material Replacement
Bidding
Summersville, WV

Babcock State Park Septic System Replacement
Bidding
Clifftop, WV

Mozart Sanitary Sewer Extension Project Contract 4
Post-Bid
$150,000 est. value
Wheeling, WV 26003

Old Main Sanitary Sewer Upgrades
Post-Bid
Huntington, WV 25755

S--36C24519q0141 | Grease Trap Cleaning | Huntington WV VA
Results
Huntington, WV 25704

Phase 3 - Wastewater Collection and Treatment System Improvements
Results
Wheeling, WV 26003

Gerrardstown Pump Station, Forcemain and Wastewater Treatment Plant Decommission Project
New Construction
Bidding
Charleston, WV

Sewage Pumping Burnsville Lake
Post-Bid
Burnsville, WV

6th Street Sewer
Results
$282,455 est. value
Glen Dale, Wheeling, WV 26003

Coalwood Sewer Project (Phase 1) Contract 1 - Wastewater Collection System
Post-Bid
Welch, WV

Sanitary Sewer Improvements
Results
Nutter Fort, WV 26301

North Bend State Park Sewer Line Replacement
Post-Bid
South Charleston, WV

Cardinal Pointe Section I
Results
$500,000 est. value
Martinsburg, WV 25401

Lift Station 9 Forcemain Extension
Results
Bridgeport, WV 26330

Timberwalk Sanitary Sewer Extension Project
Results
Martinsburg, WV 25402

Last Updated 12/21/2020 01:51 PM
Project Title

Sanitary Sewer Improvements

Physical Address View project details and contacts
City, State (County) Cameron, WV   (Marshall County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 LS Mobilization/Demobilization, 1 LS Erosion and Sediment Control, 1 LS Reclamation of Disturbed Area, 375 LF 8" PVC SDR-35 Gravity Sewer Pipe (0'-6' Deep), 375 LF 8" PVC SDR35 Gravity Sewer Pipe (6'-9' Deep), 25 LF 8" PVC SDR-35 Gravity Sewer Pipe (9’ - Up), 260 LF 8" DI CL-52 Gravity Sewer Pipe (0'-6' Deep), 80 LF 8" DI CL-52 Gravity Sewer Pipe (6' - Up), 25 LF 12” DI CL-52 Storm Sewer Pipe, 450 LF 4" PVC SDR-35 Storm Sewer/ Service Lateral Pipe, 60 LF 4" DI CL-52 Service Lateral Pipe, 15 EA 8" X 4" PVC Wye Service Connection, 2 EA 8” X 4” DIP Wye Service Connection, 17 EA 4" Customer Cleanout and Reconnect, 5 EA 4" Customer Storm Sewer Cleanout, 3 EA Tie-in Existing Sewer Main, 1 EA Tie-in to Existing Manhole, 4 EA Cut and Plug Existing Main Sewer Line, 6 EA Remove and Replace 48" Diameter Manhole, 10 VF 48" Diameter Manhole Riser Section, 7 EA Type A Manhole Rehabilitation (Remove & Replace Frame and Cover with Water Tight Frame and Cover), 4 EA Type B Manhole Rehabilitation (Spray Line Interior, Remove & Replace Frame and Cover with Water Tight Frame and Cover), 30 LF WVDOH Type "B" Trench Repair, 475 LF WVDOH Type "C" Trench Repair, 14,000 SF 2” Gravel Drive Overlay, 270 LF Rip Rap Stream Bank Slope Protection, 1 EA WVDOH Type G Precast Storm Sewer Inlet, 20 LF Poured Concrete Ditch (Match Existing), 1 LS Control Panel Upgrade Allowance, 1 LS Remove and Replace Mechanical Bar Screen, 1 EA Spare Pump for Influent Pump Station, 1 LS Remove and Replace SBR Basin #1 & #2 Waste Sludge Pump, Guiderails and Base, 1 LS Flow Monitoring and Level Sensor Replacement, 1 LS Remove and Replace Decanter Actuators with VFD Operated Actuators and Local Control Box, 1 LS Remove and Replace Dissolved Oxygen Monitoring Equipment.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents