Similar Projects
Standby Urgency Highway Repairs Contract: 2021 and 2022
Bidding
$900,000 est. value

Redi Project Mo-16 Cranberry Road at Edgemere Drive
Bidding
Greece, NY

Pavement & Curb Replacement
Post-Bid
$2,300,000 to $2,900,000 est. value
Rochester, NY

Asphalt Paving
Post-Bid

Magee Avenue/Raines Park Group Improvement Project
Results
Less than $1,278,000 est. value
Rochester, NY 14614

East Avenue/Wilder Road/Bennett Road Improvement
Results
Hilton, NY

Highway Preventive Maintenance Program 8
Post-Bid
Rochester, NY 14614

2019 Preventive Maintenance NW Group 5
Term Contract
Results
Less than $2,800,000 est. value
Rochester, NY 14614

North Road Rehabilitation
Results
Rochester, NY 14614

Highway Preventative Maintenance Project 7
Results
Rochester, NY 14614

Surface Restoration-Term Construction Contract (TCC 4)
Results
Rochester, NY 14614

Asphalt Concrete Milling and Resurfacing on NY Route 96
Results
Less than $2,800,000 est. value
Perinton, Pittsford, NY 14450

Pavement Rehabilitation including Drainage, Traffic Signals
Results
Irondequoit, Rochester, NY 14602

2.05 Miles of Asphalt Concrete Reconstruction on Route 252
Results
Less than $4,200,000 est. value
Henrietta, NY 14467

2020 Preventive Maintenance Group II
Results
Less than $2,549,140 est. value
Rochester, NY 14614

Last Updated 07/24/2020 03:40 PM
Project Title

Design Build Services for I 390/I 490/31 (Lyell Ave) Interchange Improvements Phases 3 and 4

Physical Address View project details and contacts
City, State (County) NY   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $85,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work envisioned for this project will include construction of a new two-lane I-390 Southbound flyover over the main interchange;completion of Lyell Avenue improvements west of I-390 to Howard Avenue; replacement of the Buffalo Road (Route 33) bridge over I-390; rehabilitation of pavement on Routes I-390 and I-490 within the project limits; and, the installation of noise walls.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents