Similar Projects
Black Butte Business Park Phase 3 / Nampa
New Construction, Infrastructure
Conception
$8,000,000 CJ est. value
Nampa, ID 83687

RFQ D/B - New Dry Storage Building
New Construction, Infrastructure
Design
$260,000 CJ est. value
Nampa, ID 83687

Laguna Apartments
New Construction, Infrastructure - 9,714 SF
Design
$17,250,000 CJ est. value
Nampa, ID 83651

RFQ D/B - Health and Science and Horticulture Building, College of Western Idaho
New Construction, Infrastructure
Bidding
$48,000,000 CJ est. value
Nampa, ID 83687

Franklin Rd Widening, Star Rd to Sh-16, Utility Construction Package
Infrastructure
Bidding
$500,000 CJ est. value
Nampa, ID 83651

Pickles Butte Sanitary Landfill Dust Control System Project
Infrastructure
Post-Bid
Nampa, ID 83686

2022, Ustick Road Widening, Ashton Avenue to I-84
Infrastructure
Post-Bid
$260,000 CJ est. value
Caldwell, ID 83687

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Construction of Approximately 1100 feet of 8-inch Potable Water Line
Infrastructure
Results
$235,000 est. value
Nampa, ID 83687

Sonata Pointe West Townhomes - Phase 2
New Construction, Infrastructure
Pending Verification
$17,000,000 CJ est. value
Nampa, ID 83651

McDermott Road Industrial
New Construction, Infrastructure - 703,300 SF
Pending Verification
$378,000,000 CJ est. value
Nampa, ID 83687

I-84: Benson Creek and Moores Hollow interchange bridges
Infrastructure
Design
$4,541,997 CJ est. value
Caldwell, ID 83605

STC-3857, Sand Hollow; Oasis to Black Canyon Rd
Infrastructure
Bidding
$5,000,000 CJ est. value
Caldwell, ID 83607

Ustick Road and Santa Ana Avenue Roundabout
Infrastructure
Post-Bid
$950,000 est. value
Nampa, ID 83687

Waterworks Materials Restock
Infrastructure
Results
Nampa, ID

Last Updated 09/29/2022 07:32 AM
Project Title

Annual Irrigation Replacement FY21 - Phase 2

Physical Address View project details and contacts
City, State (County) Nampa, ID 83651   (Canyon County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $485,315 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of installing new pressure irrigation mains, connecting the new mains to the City's existing pressure irrigation system, installing new irrigation services, asphalt paving, concrete replacement, boring under the Phyllis Canal, and traffic control. The project is located on Sunny Lane between N Hawthorn Place and N Stanford Street and includes installing approximately 1,100 feet of new 12-inch pressure irrigation line, including the bore underneath the Phyllis Canal.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents