Similar Projects
Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Bidding
Carrabassett, ME

Pavement Milling, Ultra - Thin Bonded Wearing Course, with Safety Improvements
Bidding
Rangeley, ME

Down-Town Infrastructure Improvements - Phase 2
Term Contract
Post-Bid
Rumford, ME

New Muddy Brook Bridge Wearing Surface Replacement
Results
New Sharon, ME 04955

2020 Roadway Paving
Results
Norway, ME

Stanley Hill Pavement Reclamation
Bidding
Fryeburg, ME 04037

Loon Lake Road Rangeley
Results
Rangeley, ME

Hot Mix Asphalt Overlay With Safety Improvements
Results
ME

(LCP) Light Capital Paving
Results
Anson, Farmington, New Sharon, Starks, Town Of Chesterville, ME 04938

(LCP) Light Capital Paving
Results
Chesterville, Farmington, Fayette, Temple, Town Of Chesterville, Wilton, ME 04938

Cyclical Pavement Resurfacing and Safety Improvements
Results
Fryeburg, Lovell, ME 04037

(LCP) Light Capital Paving
Results
Bridgton, Casco, Gorham, Harrison, Naples, Otisfield, Oxford, Sebago, Standish, Waterford, ME 04009

On Call Maintenance Paving/Located in Regions 1-5
Results

2020 Roadway Paving
Results
Less than $300,000 est. value
Paris, ME

East B Hill Road Reconstruction
Results
Upton, ME

Last Updated 03/25/2021 05:53 AM
Project Title

(Lcp) Light Capital Paving

Physical Address View project details and contacts
City, State (County) Carthage, Dixfield, Jay, Weld, Wilton, ME (Franklin, Oxford Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,327,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location: In Franklin and Oxford Counties, project is located: Map ID 1 is in Wilton on Main Street beginning at the intersection with Route 2 and extending northerly to the southwesterly junction of Route 156. Includes paving shoulders and milling and paving Bridge #2336. Map ID 2 is in Wilton on Main Street beginning at the northeasterly junction of Route 156 and extending northeasterly to the intersection with Route 2/4. Includes paving shoulders. Map ID 3 is in Dixfield, Carthage, and Weld on Route 142 beginning at the intersection with Route 2/17 and extending northerly to the intersection with Route 156. Includes milling and paving Bridge #5181, #2610, #2916, #5362, and #5361. Map ID 4 is in Weld on the Center Hill Road beginning at the intersection with Route 142/156 and extending northerly to the intersection with the Plummer Road. Map ID 5 is in Weld on the Back Road beginning at the southerly intersection with Route 142 and extending northerly to the northerly intersection with Route 142. Map ID 6 is in Wilton, Washington Twp., Perkins Twp., and Weld on Route 156 beginning at the intersection with Route 2/4 and extending northwesterly to the intersection with Route 142. Includes milling and paving Bridge #5066, #5364, #5367, and #2484. Map ID 7 is in Jay and Wilton on the Maxwell Road beginning at the intersection with Route 4 and extending northerly to the intersection with Route 2.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents