Similar Projects
The Gables On Lawrence
New Construction, Infrastructure
Conception
$51,000,000 CJ est. value
Fairhope, AL 36532

Waterway Village Pedestrian Bridge - City of Gulf Shore
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Gulf Shores, AL 36542

Skyline Village Townhomes
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fairhope, AL 36532

Orange Beach Medical Plaza
New Construction, Infrastructure - 11,000 SF
Design
$6,400,000 CJ est. value
Orange Beach, AL 36561

New Sidewalk Along County Road 49 (Magnolia Street)
Infrastructure
Bidding
$650,000 CJ est. value
Loxley, AL 36551

New Sidewalk Along County Road 49 (Magnolia Street)
Infrastructure
Bidding
$650,000 CJ est. value
Loxley, AL 36551

Provision of Labor and Equipment for Asphalt Placement
Infrastructure
Post-Bid
AL

Country Club Drive Water Main Replacement Phase A- Wedgewood Drive to Fairway
Infrastructure
Post-Bid
$300,000 CJ est. value
Daphne, AL 36526

Orange Beach High School Turnout
Infrastructure
Results
$58,891 est. value
Orange Beach, AL 36561

Access Road for Proposed Diamante Well
Infrastructure
Results
$89,530 est. value
Daphne, AL

Tom Thumb with Burger King & Cinnabon
New Construction - 6,500 SF
Construction
Orange Beach, AL 36561

Beef O' Bradys / Spanish Fort
New Construction, Infrastructure - 6,000 SF
Construction
$2,000,000 CJ est. value
Spanish Fort, AL 36527

Aldi / Daphne
New Construction, Infrastructure
Pending Verification
$3,500,000 CJ est. value
Daphne, AL 36526

Lazzari Truck Repair
Addition
Pending Verification
Daphne, AL 36526

U-Haul Self-Storage Facility / Daphne
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Daphne, AL 36526

Last Updated 04/07/2023 07:06 PM
Project Title

Christian Brothers Automotive - US-90 / Daphne

Physical Address View project details and contacts
City, State (County) Daphne, AL 36526   (Baldwin County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

*The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.

Details

1 Story Above Grade, 5,810 SF.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents