Similar Projects
Town Building Updates and Repairs - Mechanical Construction
Term Contract, Renovation
Design
$900,000 CJ est. value
Scipio Center, NY 13147

Addition and Renovations for Beacon Fire Station - Mechanical Contract
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Beacon, NY 12508

Reimagine Phase R4a - Odyssey Contract 403A Mechanical Construction
Renovation
Sub-Bidding
$400,000 CJ est. value
Rochester, NY 14604

Pier 97 Building Mechanical
Alteration
Post-Bid
New York, NY 10014

Gowanus Houses Boiler Replacement
Alteration
Post-Bid
New York, NY 10007

Cemline V200swh624, Steam Powered Water Heater
Results
Great Neck, NY 11024

DPW and HEO Building Heating Systems
Alteration
Results
Plattsburgh, NY 12903

2020 Capital Improvement Project Phase 1B - Building Improvements Contract 8: Early Learning Center - Mechanical Construction
Renovation
Construction
$250,000 CJ est. value
Poughkeepsie, NY 12601

Albany High School Additions and Renovations Phase 4
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$3,600,000 CJ est. value
Albany, NY 12203

2022-2027 Community HVAC and Hot Water Services
Term Contract
Post-Bid

Quaker Area Comfort Stations - Mechanical
Renovation
Results
$90,000 to $130,000 est. value
NY

Purchase and Deliver Ductile Iron Pipe
Alteration
Post-Bid
Watertown, NY

Repair and Replace of Heating Pipe and Mechanical Equip Insulation - Citywide
Alteration
Results
New York, NY 10065

State Phase II A Boiler Replacement and Hot Water Heaters
Alteration
Post-Bid
New York, NY 10025

Boiler Tube Replacement Services
Alteration
Results
New York, NY

Last Updated 04/27/2023 02:09 AM
Project Title

Reconstruction Work Indian Lake Central School District - Mechanical Construction

Physical Address View project details and contacts
City, State (County) Indian Lake, NY 12842   (Hamilton County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $593,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Board of Education of the Indian Lake Central School District invites the submission of Separate Sealed Bid Proposals to furnish materials and labor to complete the Reconstruction project all in accordance with the plans and specifications for the following categories of work: Reconstruction Work - Mechanical Construction New HVAC to Gymnasium, Refinish Wood Gymnasium Floor, and Asbestos Abatement Any bid may be withdrawn without prejudice prior to the official bid opening time or any publicized postponement thereof. Any bid received after the time and date stated above will be returned to the bidder unopened. The deposit will be refunded ONLY to those bidders who submit a bona fide bid proposal in accordance with the terms in the "Information for Bidders" and who return a complete set of Bidding Documents in COMPLETE, UNMARKED, and NOT TORN condition to REV within thirty (30) days after the award of contract(s) covered by such Bidding Documents, or the rejection of such bid(s). Non-bidders, including material suppliers and subcontractors, as well as plan holders who do not submit bid proposals, WILL NOT be eligible for a refund. Addenda: All bid addenda will be transmitted to registered plan holders via email and will also be available electronically. Plan holders who have paid for hard copies of the bidding documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with REV for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. Each Bidder shall prepare their bid proposal, along with a bid security, in accordance with the terms and subject to the conditions set forth in the "Information for Bidders". Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and the minimum wage rates to be paid under the contracts. No bidder may withdraw his bid within 45 days after the date of the actual bid opening. The Board of Education reserves the right to reject any or all bids and to waive any informalities or defects in such bid either before or after the bid opening. Bidders can inspect the work locations before submitting bids. This can be done any Monday through Friday, except holidays, during hours when there will be School District Staff Personnel in the building. Unless directed otherwise, immediately upon entering the building, report to the School Office. This page of the specification may be used to identify you as a bidder. Follow instructions of School Personnel and keep interruptions to teaching activities to a minimum. A. Work shall not be started until 6/26/2024. B. All work shall be completed as quickly as possible and installation shall be substantially complete and operable not later than 10/31/2024. C. All project closeout documentation is due no later than 11/30/2024. No interpretations of the meaning of the plans, specifications or other contract documents will be made to any bidder orally. Every question for such interpretations shall be submitted via email to Project Manager: Thomas Schiller, tschiller@mosaicaa.com. Project Location: 6345 NY-30, Indian Lake, NY 12842. The Work consists of the following: 1. The Work includes new HVAC to Gym, refinish Gym floor, and asbestos abatement.

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents