Similar Projects
West Carroll Avenue Mixed use
New Construction
Conception
Chicago, IL 60607

Retail Mall
New Construction
Conception
Chicago Ridge, IL

Walmart Supercenter #5485-201 - RM-3
Renovation - 149,377 SF
Design
Chicago, Evergreen Park, IL 60805

Walmart Supercenter #3725-223 - SPRB-1
Renovation - 142,129 SF
Design
Niles, IL 60714

Air Room and Tread Bike Shop Renovations
Renovation
Bidding
Chicago, IL 60609

Aldi #60
Renovation - 21,178 SF
Bidding by Invitation
Hodgkins, IL 60525

Target #0835 - Grocery Pick-UP
Renovation - 500 SF
Post-Bid
Schaumburg, IL 60194

Target #1125 - Grocery Pick-UP
Renovation - 500 SF
Post-Bid
Niles, IL 60714

Auburn Gresham Development - Developer RFP
New Construction
Results
Chicago, IL 60652

Austin - Laramie State Bank Site - Developer RFP
Results
Chicago, IL 60651

Sam's Club #6489-208 - ROT
Renovation - 700 SF
Construction
Calumet City, IL 60409

Walmart Supercenter #5485-234 - SPRB-R
Renovation - 149,377 SF
Construction
$1,109,186 est. value
Evergreen Park, IL 60805

Cassidy Place Mixed Use
New Construction
Pending Verification
$139,000,000 est. value
Chicago, IL 60654

Mixed-Use Building
New Construction - 47,000 SF
Pending Verification
Chicago, IL 60642

West Higgins Road Gas Station & Retail
New Construction, Demolition - 7,100 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Hoffman Estates, IL

Last Updated 04/06/2021 04:03 PM
Project Title

Poplar Prairie Stone Crossing Shell

Physical Address View project details and contacts
City, State (County) Hoffman Estates, IL 60192   (Cook County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method
Project Status Construction Commenced October 2020, Construction Complete as of March 2021
Bids Due View project details and contacts
Estimated Value $1,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope entails: new facades, a demising wall, new RTU units, providing plumbing stubs, and splitting the electrical service. Required Subcontractors include: Active Roofing Co Inc, 773-238-0338 admin@activeroofing.com and Contech MSI, The Fire Alarm Co 847-483-3836 info@contechco.com

Details

Retail, Renovation.
Division 01 - General Requirements, Commissioning, Facility Shell Commissioning, Roofing Commissioning.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Steel Framing, Structural Metal Stud Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Exterior Insulation and Finish Systems, Siding, Fiber-Cement Siding.
Division 08 - Openings, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts.
Division 09 - Finishes, Gypsum Board, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 32 - Exterior Improvements, Planting, Planting Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents