Similar Projects
Chauncey Bikeways
Infrastructure
Design
$2,224,230 CJ est. value
Athens, OH 45701

US 33 - Roadway Minor Rehab
Infrastructure
Design
$5,822,500 CJ est. value
Athens, OH 45701

Ath-West Union Street RE-BID
Infrastructure
Bidding
$6,970,287 CJ est. value
Athens, OH 45701

Ath-motor Paving 2023
Infrastructure
Bidding
$594,000 CJ est. value
Athens, OH 45701

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

North Green Watermain Replacement 2021
Infrastructure
Results
$294,000 est. value
Athens, OH

NPHC Garden 2021
Infrastructure
Results
$310,000 est. value
Athens, OH

US Route 33, US Route 50 Interchange Improvement - County of Athens
Infrastructure
Construction
$7,000,000 CJ est. value
Athens, OH 45701

Kershaw Greene Apartments Phases III & IV
New Construction, Infrastructure
Pending Verification
$32,000,000 CJ est. value
Athens, OH 45701

University Estates Medical Office Building
New Construction, Infrastructure - 1,500 SF
Pending Verification
$900,000 CJ est. value
Athens, OH 45701

Paving Bid
Infrastructure
Post-Bid
$200,000 CJ est. value
Albany, OH 45710

Hocking River Crossing Water Main Replacement 2022
Infrastructure
Results
$250,000 est. value
Nelsonville, OH 45764

RFQ Engineering - U.S. Route 50 West Corridor Sewer Project
Infrastructure
Post-Bid
$600,000 CJ est. value
Athens, OH 45701

Sheriff's Office Shooting Range
New Construction
Results
$200,000 est. value
Athens, OH 45701

Last Updated 06/20/2023 09:07 AM
Project Title

Water System Improvements Phase II - 2023

Physical Address View project details and contacts
City, State (County) Nelsonville, OH 45764   (Athens County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $5,439,810 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work shall consist of furnishing all labor, materials, and equipment in accordance with the contract documents. Each bid shall be accompanied by a Bid Guaranty and Contract Bond as required by Section 153.54 of the Ohio Revised Code in an amount equal to the sum of the bid submitted by each contractor. In lieu of posting the bond, a bidder may use a Cashier's Check, Certi- fied Check or Letter of Credit for ten percent of the Contractor's bid as bid security. When a check or letter of credit is used, the bidder shall be required to post a 100 percent Performance Bond and a 100 percent Labor and Material Payment Bond, upon the signing of the contract. Federal Prevailing Wage Rates and Equal Employment Opportuni- ty requirements are applicable to this project. Failure to submit the Bid Guaranty Bond and the required notarized affidavits with the bid shall be cause for considering the bid sub- mission incomplete and for the rejection of the bid. Each bid must contain the full name of the party or parties submitting the bid and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. All contractors and subcontractors involved with the project will, to the extent practicable use Ohio Products, materials, services, and la- bor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123.2, the Governors Exec- utive Order of 1/27/72, and Governor's Executive Order 84-9 shall be required. DOMESTIC STEEL USE REQUIREMENTS AS SPECIFIED IN SECTION 153.011 OF THE REVISED CODE APPLY TO THIS PROJECT. COPIES OF SECTION 153.011 OF THE REVISED CODE CAN BE OBTAINED FROM ANY OF THE OFFICES OF THE DEPARTMENT OF ADMINISTRATIVE SERVICES. Material must comply with the American Iron & Steel (AIS) Requirement of the Consolidated Appropriations Act of 2014 (Public Law 113-76). The Project work shall consist of furnishing all labor, materials, and equipment in accordance with the contract documents. Project cost estimate is $4,135,000.00 The Owner reserves the right to reject any and all bids, and the right to accept the lowest and best bid, the right to waiver minor irregularities on any bid, and the right to accept the bid proposal which promotes the best interest of the Owner. The current negotiated goals for construction related activities are 1.3% of all contracts to MBEs and 1.0% of all contracts to WBEs.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents