Similar Projects
ADA Curb Ramps - Group 63
Bidding
$312,732 est. value
Memphis, TN

ADA Curb Ramps - Group 62
Bidding
$633,100 est. value
Memphis, TN

FY20 Sidewalks Contract
Post-Bid
Chattanooga, TN 37402

Brownfield Cleanup at Former Glover Tract- Riverwalk Trail
Post-Bid
Chattanooga, TN 37400

Construction of Sidewalks
Results
Less than $1,191,205 est. value
Red Bank, TN 37415

CDBG Sidewalk Install/Repair
Results
Less than $907,898 est. value
Chattanooga, TN

ADA Curb Ramps - Group 64
Infrastructure
Bidding
Memphis, TN

Broad Street Sidewalk Repair
Post-Bid
Chattanooga, TN 37402

Street Improvements and Camp Jordan Parking Lot Expansion
Results
Chattanooga, TN 37412

ADA Curb Ramps - Group 65
Infrastructure
Bidding
Memphis, TN

Construction of a New Parking Lot
Post-Bid
Cleveland, TN 37320

Construction of the Police Department Parking Lot Addition
Results
Less than $109,758 est. value
Red Bank, TN 37415

Lexington Multimodal SR-20 Community Access Phase II
Infrastructure
Bidding
Lexington, TN 38351

Clark Street Streetscaping
Post-Bid
Dyersburg, TN 38024

Concrete Pathway Installation, Landscaping, Storm Water Structure Modifications, Irrigation System, L.E.D. Pedestrian Lighting, Installation of ADA Compliant Crossing Ramps, Railroad Safety Improvements
Results
Chattanooga, TN

Reported 12/22/2021 12:00 AM
Project Title

Piney River Trail Construction

Physical Address View project details and contacts
City, State (County) Spring City, TN   (Rhea County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Greater than $250,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This event is to bid for a one-year contract for agency: TN Department of Environment & Conservation.The trail must be designed to provide a long lasting, sustainable, back country trail that can be traversed by novice hikers with moderate effort. Due to the nature of the terrain and location of the project, the trail section will not be designated as an Americans with Disabilities (ADA) compliant trail. The trail will be designed for hiking and foot traffic only.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents