Similar Projects
Kids Empire
Renovation
Conception
Cypress, TX

Kids Empire
Renovation
Conception
Sugar Land, TX

Natatorium and Gym
Renovation - 90,350 SF
Design
San Antonio, TX 78225

Fins
Renovation - 7,009 SF
Design
$560,000 est. value
The Woodlands, TX 77354

Tennis Facilities - Pharr Tennis Center Renovations
Renovation
Bidding
$1 to $2,700,000 est. value
Austin, TX 78722

Tiger Stadium Athletic Complex
Post-Bid
Wharton, TX

Tiger Baseball/Softball Complex Package "A"
Post-Bid
El Campo, TX

Foster High School Athletic Improvements
Results
Less than $500,000 est. value
Richmond, TX 77406

Bartlett Sports Complex Park Amphitheater Project
Results
Less than $117,950 est. value
Laredo, TX 78040

Austin FC Stadium
New Construction
Construction
Austin, TX 78758

The Crossover
New Construction - 240,000 SF
Construction
$10,000,000 CJ est. value
Cedar Park, TX 78613

St. David's Performance Center
New Construction - 33,876 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Austin, TX 78753

Great Hearts Forest Heights Academy Phase 2
New Construction - 54,877 SF
Pending Verification
$9,000,000 est. value
San Antonio, TX 78240

Crux Climbing Center
New Construction - 55,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Round Rock, TX 78665

Kids Empire
Renovation - 14,000 SF
Design
Dallas, TX 75224

Reported 11/06/2020 12:00 AM
Project Title

Southwest Independent School District Aquatics Center

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78242   (Bexar County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

This new facility will be located on Southwest Loop 410 directly North of Christa McAuliffe Middle School. The two-level structure houses two Myrtha swimming pools: a 50-meter competition pool with diving and a 25-yard instructional / warmup pool. The support spaces on the First Level include restrooms, lockers / showers, classroom, weight room, pool equipment storage and the main public entry. Spectator seating is located on the Second Level, along with meeting rooms and offices for coaches and District personnel. The main pool area is ventilated and heated only. The remainder of the facility has a full HVAC system. The site is fully developed, with asphalt parking areas, concrete curbs / sidewalks, landscaping / irrigation and underground utilities.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents