Similar Projects
Sidewalk Improvements
Infrastructure
Bidding
$75,000 CJ est. value
Prophetstown, IL 61277

Sidewalk Improvements
Infrastructure
Bidding
$75,000 CJ est. value
Prophetstown, IL 61277

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Water Main Improvements
Infrastructure
Post-Bid

1st Avenue Reconstruction
Renovation
Results
Less than $2,648,519 est. value
Sterling, IL 61081

Hydro Plant Construction Services - Transformer Replacement Site Modifications
Results
Rock Falls, IL

Water System Improvements Contract - New Well No. 5 and Water Treatment Plant
New Construction, Renovation, Infrastructure - 3,590 SF
Bidding
$1,500,000 CJ est. value
Prophetstown, IL 61277

Public Water Supply Geotechnical Consulting
Infrastructure
Post-Bid
Rock Falls, IL

Former Limestone Building Property - Earthwork Grading Improvements
Infrastructure
Results
Rock Falls, IL 61071

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

3rd Avenue Reconstruction
Infrastructure
Results
$1,396,391 est. value
Rock Falls, IL 61071

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Post-Bid
Schaumburg, IL 60194

Oppold Marina Site Improvements
Infrastructure
Results
Sterling, IL 61081

Parking Lot Project (Grading, Gravel Drainage)
Infrastructure
Post-Bid
$285,000 est. value
Erie, IL 61250

Watermain Replacement
Infrastructure
Results
Rock Falls, IL 61071

Last Updated 09/12/2022 01:05 PM
Project Title

Sanitary Sewer System Rehabilitation 2022

Physical Address View project details and contacts
City, State (County) Sterling, IL 61081   (Whiteside County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $464,219 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work for which the City of Sterling Illinois is soliciting bids consists of one contract SANITARY SEWER SYSTEM REHABILITATION 2022 and includes the following Install a curedinplace liner in 1145 feet of 24" diameter 362 feet of 15" diameter and 845 feet of 8" diameter sanitary sewers install chemical grouting of 62 sanitary sewer services and manhole rehabilitations complete with appurtenances and surface restoration A certified check or bank draft, payable to the order of the City of Sterling negotiable U.S. Government Bonds (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total bid shall be submitted with each bid. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project, and that the CONTRACTOR must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. The City of Sterling is an equal opportunity employer. The City of Sterling does not discriminate on the basis of handicapped status in the admission or access to, or treatment or employment in, its programs or activities. The City of Sterling reserves the right to reject any or all bids or to waive any informality in the bidding. Bids may be held by the City of Sterling for a period not to exceed sixty (60) days from the date of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the Contract 1. Install a cured-in-place liner in approximately 2,352 feet of 24" diameter sanitary sewer. 2. Install a cured-in-place liner in approximately 362 feet of 15" diameter sanitary sewer. 3. Install a cured-in-place liner in approximately 845 feet of 8" diameter sanitary sewer. 4. Reinstate and chemically grout 62 sewer services. 5. Install a spray on liner in approximately 77.5 vertical feet of sanitary manhole and one sanitary structure. 6. Replace (12) manhole adjustment rings and castings.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents