Similar Projects
US 12/Walla Walla River Bridge - Bridge Painting
Infrastructure
Conception
$2,365,000 CJ est. value
Wapato, WA 98951

US 12/Walla Walla River Bridge - Bridge Painting
Infrastructure
Conception
$2,365,000 CJ est. value
Wapato, WA 98951

Early Learning Center - Heritage University
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Toppenish, WA 98948

Early Learning Center - Heritage University
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Toppenish, WA 98948

White Swan Water Source Improvements
Infrastructure
Bidding
$500,000 CJ est. value
White Swan, WA 98952

Regional Beltway Connector Stage 2A
Infrastructure
Bidding
$3,000,000 CJ est. value
Union Gap, WA 98903

West Ahtanum Road Resurfacing
Infrastructure
Post-Bid
Union Gap, WA 98903

Dollar General #23747 / Harrah
New Construction, Infrastructure - 12,480 SF
Post-Bid
$2,000,000 CJ est. value
Harrah, WA 98933

Cleman's View Park - Park and Ride
Infrastructure, Alteration
Results
$413,060 est. value
Naches, WA 98937

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Surf Barreled
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Yakima, WA 98901

Surf Barreled
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Yakima, WA 98901

SR 410/1.0 miles E of Chinook Pass Summit - Culvert Lining
Infrastructure
Conception
$1,436,000 CJ est. value
Naches, WA 98937

SR 22 / SR 223 Chambers Rd Intersection - Intersection Safety
Infrastructure
Design
$735,000 CJ est. value
Toppenish, WA 98948

Collins Road Improvement Project
Infrastructure
Post-Bid
Selah, Sunnyside, WA 98942

Last Updated 02/10/2023 07:34 AM
Project Title

US 12/Gordon Rd Bridge EB - Deck Rehabilitation

Physical Address View project details and contacts
City, State (County) Wapato, WA 98951   (Yakima County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $5,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The bridge deck is showing signs of fatigue. Repair and resurface the existing bridge deck to maintain the structural integrity, continue safe operation of the highway, and extend the life of the bridge. As of February 10, 2023, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be complete in the fourth quarter of 2022. The contract advertisement is expected in first quarter of 2023 and construction is anticipated to be operationally complete in the fourth quarter of 2023. WSDOT - US 12/Gordon Rd Bridge EB - Deck Rehabilitation *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents