Similar Projects
RUSD 2022 Bond Projects - Future Phases
Renovation
Design
$34,500,000 est. value
MI

Ford Community and Performing Arts Center Curtainwall Repair
Alteration
Bidding
$3,000,000 est. value
Dearborn, MI 48126

Overhead Garage Doors and Installation
Alteration
Bidding
$40,000 est. value
Detroit, MI 48228

Detroit Public Schools Community District 2022 Capital Improvements Series 1
Renovation
Sub-Bidding
$24,000,000 CJ est. value
Detroit, MI 48202

Detroit Public Schools Community District 2022 Capital Improvements Projects - Series 2
Renovation
Sub-Bidding
$24,000,000 CJ est. value
Detroit, MI 48226

Fire House Bay Doors and Opener-Fire/C.E .Raines
Post-Bid
Riverview, MI 48193

Wood Window Replicas
Post-Bid
Detroit, MI

Brown and Miller Elementary Schools Phase 3
Results
New Boston, MI 48164

Skylight Replacement Summit Gymnasium
Results
Canton, MI 48188

BP#5-R Lathers, Burger Transition Center, Cambridge, Garden City Middle School
Renovation
Bidding
Garden City, MI 48135

Historical Window Restoration
Term Contract
Post-Bid
Detroit, MI

Miscellaneous Doors, Hardware, and Related Supplies
Term Contract
Results
Detroit, MI

AMCO Building Renovations
Renovation
Bidding
$310,000 CJ est. value
Livonia, MI 48150

DPW Window Replacements
Alteration
Post-Bid
Taylor, MI

Annual Overhead Doors Inspections And Repairs
Results
Detroit, MI

Last Updated 07/22/2022 02:35 PM
Project Title

RFP- Window Replacement

Physical Address View project details and contacts
City, State (County) Southgate, MI 48195   (Wayne County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Windows/Doors
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $420,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Creative Montessori Academy is planning for the removal and replacement of windows from the building. Creative Montessori Academy Board of Directors Purchasing Policy 6320, in compliance with Michigan law, requires competitive bids for this project. Bidders shall submit bid packages that provide the following information: 1. Company Profile: Provide an overview of the company including experience in window removal and replacement, and scope of services, materials, and product the company provides. 2. Project Team: Identify the project team manager including contact information (electronic mail and telephone). 3. Pricing: Identify pricing based on the work described in the project as the general scope of the equipment plus installation. Pricing can be in an all inclusive (turnkey) bid or on an item-by-item bid price. 4. Specifications Compliance: Attachment A must be included in the bid package. 5. Signature Page The bid package is to consist of one copy of each of the required documents. Bids submitted that lack any of the required information or documentation may be deemed incomplete and may not be considered for selection, at the discretion of the Creative Montessori Academy Board of Directors, or its designee. Window replacement in stairwell and cafeteria.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents