Similar Projects
Center of Innovation and Entrepreneurship
New Construction
Conception
Saint Louis, MO

Remington Nature Center Beams - 250688 - City of Saint Joseph
New Construction
Conception
Less than $500,000 est. value
Saint Joseph, MO 64505

Horticulture Farm Agroforestry Education & Research Center New Building Shell
New Construction - 4,920 SF
Design
$535,000 est. value
Columbia, MO

Medical Science Building Morgue Facility Update
Renovation - 2,600 SF
Design
$581,307 est. value
Columbia, MO

Downtown Joplin Public Library Redevelopment
Renovation
Bidding
$1,000,000 CJ est. value
Joplin, MO 64801

Pershing Hall - Renovation for MU Student Health Center and SOM/MUHC Offices
Renovation - 32,170 SF
Bidding
$6,300,000 CJ est. value
Columbia, MO 65212

Temple Hall Addition & Renovation - Milestone B Package
Renovation
Sub-Bidding
$55,400,000 CJ est. value
Springfield, MO 65897

Welding Building
New Construction
Post-Bid
MO

Classroom Alterations at the Area Technical School building on the Hillsboro campus
Renovation
Post-Bid
Hillsboro, MO

University of Missouri Teaching Hospital-Fitout Space 2W
Renovation
Results
$2,000,000 to $2,221,575 est. value
Columbia, MO 65201

University of Missouri Teaching Hospital-CT Replacement, 2E07
New Construction
Results
$360,000 to $400,000 est. value
Columbia, MO 65201

Memorial Student Union Restroom Renovation S111 & S113
Renovation
Construction
$160,500 est. value
Columbia, MO

Ponce Health Sciences University Medical School
New Construction, Infrastructure - 150,000 SF
Pending Verification
$80,000,000 CJ est. value
Saint Louis, MO 63101

Crowder Hall Renovation - University Of Missouri
Renovation - 25,181 SF
Pending Verification
$7,711,000 CJ est. value
Columbia, MO 65203

Health Sciences Campus/ School of Medicine and School of Dentistry Renovations - University of Missouri-Kansas City
Demolition, Renovation
Conception
$15,000,000 CJ est. value
Kansas City, MO 64110

Last Updated 01/26/2023 09:04 AM
Project Title

Spencer Chemistry and Biological Sciences Renovation - Phase 2 - University of Missouri - Kansas City

Physical Address View project details and contacts
City, State (County) Kansas City, MO 64110   (Jackson County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Seeking Funding, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project would continue the renovation of the 153,827 gross square feet (GSF) Biological Sciences Building and Spencer Chemistry Building. The second phase will renovate approximately 75,000 GSF in both Spencer Chemistry and the Biological Sciences Building. This project will build upon the first phase, which is nearing completion and funded by the State with the Board of Public Buildings Bond as the primary funding source. The current phase is substantially complete as of August 2018. The Phase II renovation will address additional deferred maintenance, research space, teaching spaces, and other facility deficiencies that were beyond reach of the Phase I budget. The renovation will provide state of the art teaching laboratories and support spaces, while providing improved laboratory systems to support research activities, support student retention, meet current laboratory standards, and encourage student collaborative learning. As of January 26, 2023, this project is included in the University of Missouri System's 2023-2027 CIP. A program planning study has been completed. This project is in the conceptual phase and is on indefinite hold due to funding. An architect has not been selected. The project will not proceed until state funding is approved. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents