Similar Projects
Miami International Airport (MIA) Central Terminal Ticket Counters, Conveyors, and K-1 doors for TC 12 through TC 17
Renovation
Bidding
$525,000 CJ est. value
Miami, FL 33142

Replace Five (5) A/C Unit Splits at the Annex Building at the Miami FAA Miami Air Route Traffic Control Center (ARTCC ZMA), Miami, FL
Alteration
Bidding
$500,000 to $1,000,000 est. value
Miami, FL 33166

HVAC Improvements - Package "C" Effluent Pump Station Back-up Chiller Addition, North Filter Building Substation 23 and 24, and South Filter Building Substation 27 and 28F
Renovation
Sub-Bidding
$5,434,024 CJ est. value
Miami, FL 33190

HVAC and Mechanical Products
Term Contract
Post-Bid

Chillers and Water Treatment Services
Post-Bid
FL

Chiller Plant Services
Term Contract
Results
Miami, FL 33199

JL King Ductwork Cleaning Project
Results
Miami, FL 33132

MSC PortMiami
New Construction
Construction
$300,000,000 est. value
Miami, FL

MSC Cruises Terminal at Port Miami
New Construction
Construction
$400,000,000 est. value
Miami, FL 33132

MIA - BHS Central Terminal to South Terminal Crossover
Renovation
Bidding
$3,613,886 CJ est. value
Miami, FL 33142

Weatherization Assistance Program - HVAC and Mechanical
Post-Bid
$17,454 est. value
Miami, FL 33177

A/C Repair and Maintenance Service at Various City of Miami Police Facilities
Results
Miami, FL 33128

Miami International Airport (MIA) - Concourse H Vertical Core Modifications
Demolition, Renovation
Bidding
$1,220,369 CJ est. value
Miami, FL 33142

MCC 7360 Plan RPQ Mech 046- HVAC
Post-Bid
FL

J041--Chiller & Cooling Tower Plant Maintenance & Service
Results
Miami, FL 33136

Last Updated 08/08/2022 08:36 AM
Project Title

Replace Five (5) A/C Unit Splits at the Annex Building

Physical Address View project details and contacts
City, State (County) Miami, FL 33166   (Miami-Dade County)
Category(s) Single Trades, Transportation
Sub-Category(s) Airline/Passenger Terminal, HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Amendment 0001 is issued for questions and answers The Federal Aviation Administration, Enroute Construction Group, Boston Office, AAQ-540 has a new construction requirement to furnish all labor, equipment and materials necessary to replace 5 split A/C units. The successful Contractor shall be responsible for all aspects of the replacement of the HVAC units in the Annex Building at the Miami ARTCC, Miami, FL. The Request for Offer (RFO), including Specifications, Drawings, and Wage Rates, are attached to this announcement. All documents are available in .pdf format. **drawings are not signed, signed drawings will be uploaded and replacing the unsigned drawings** The North American Classification Standard is 238220 - $16.5 Million. This procurement is set aside exclusively for Service Disabled Veteran Owned Companies in accordance with AMS Clause 3.6.1-12 NOTICE OF SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE (OCT 2019) The price range for this procurement is $500,000.00 - $1,000,000.00. Payment and Performance Bonds are required. A site visit has been scheduled Tuesday July 26, 2022 at 10:00 a.m., Due to security requirements all attendees must have a valid photo ID (i.e. state driver's license) to gain access to the site. All contractors must submit a list of attendance 48 hours in advance to Susan.Newcomb@faa.gov. Your list should include employee name and company. Any attendee not on the official list will be denied access to the facility. All attendees will be required to follow the COVID Protocol at the site. At registration you will be provided the current COVID protocols by the Contracting Officer The FAA reserves the right to review and verify each offerors program eligibility. Potential offerors should note that the FAA reserves the right to communicate with one or more offerors at any time during the SIR process. This SIR/RFO is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of proposals Note: All amendments to the solicitation will be likewise posted on this website. Contractors are cautioned to check the website periodically for amendments. A solicitation mailing list will not be compiled and amendments will not be sent out in paper copy. All contractors must be registered in the System for Award Management (SAM) website to be eligible for award of a contract. All submittals must be submitted electronically in PDF format. Faxed offers and amendments will not be accepted. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents