Similar Projects
Silvey Metal Works
New Construction - 20,000 SF
Construction
$1,200,000 est. value
Chattanooga, TN 37406

Sese Industrial Services
New Construction - 305,525 SF
Construction
$17,000,000 est. value
Chattanooga, TN 37400

Gm Battery Plant
New Construction - 2,800,000 SF
Pending Verification
Spring Hill, TN

Royal Canin Pet Food
Renovation - 108,000 SF
Pending Verification
Less than $200,000,000 est. value
Lebanon, TN

Microvast Battery Manufacturing Plant
Renovation - 600,000 SF
Pending Verification
Less than $220,000,000 est. value
Clarksville, TN 37040

Woods Air Movement to Establish North American Headquarters
New Construction - 25,000 SF
Pending Verification
Less than $3,600,000 est. value
Murfreesboro, TN

Electric Car Factory
Build-Out - 820,000 SF
Pending Verification
Less than $362,000,000 est. value
Memphis, TN 38125

VW Connector
New Construction - 5,039 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Chattanooga, TN 37421

Last Updated 02/05/2021 12:48 PM
Project Title

Volkswagen FUB Tunnel Structure

Physical Address View project details and contacts
City, State (County) Chattanooga, TN 37421   (Hamilton County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method Qualified Bidding.
Project Status All GC Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

1. Demolition work includes: a. Demolition and removal of existing RCC (Roller Compacted Concrete) paving b. Demolition and removal of existing reinforced concrete paving c. Selective demolition of roofing and roof insulation d. Selective demolition of building panels, a hollow metal door and door frame e. Selective demolition of aluminum exterior storefront windows f. Selective demolition of a building foundation wall above FFE (concrete curb) 2. Site work includes: a. Installation of metal bollards 3. Building Construction work includes: a. Concrete foundations b. Structural steel frame c. Prefinished insulated exterior metal panels d. Steel grating and decking e. Tapered roof insulation and single ply – TPO roofing f. Hollow metal frames and doors g. Galvanized exit stairs with grated landing and treads h. Interior painted stairs with grated landing and treads i. Storefront window modifications and replacement of existing glazing with aluminum architectural panels j. Aluminum ladders k. Metal stud framing l. Painting of exposed structural steel framing

Details

1 Manufacturing/Processing Plant, 9,356 SF New Construction.
Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents