Similar Projects
Luella Storage
New Construction, Infrastructure
Conception
$9,000,000 est. value
Locust Grove, GA 30248

Blastec - Site Only
Renovation
Design
Cumming, GA 30041

SR 56 From SR 24 to SR 121 Bypass
Infrastructure
Design
$700,000 est. value
Waynesboro, GA 30830

Rough Grading - Bryan County Megasite
Infrastructure
Bidding
$600,000 est. value
Savannah, GA

Champion Theme Middle School Major Building System Replacement
Renovation
Bidding
$6,063,000 est. value
Stone Mountain, GA 30083

Site Improvements for New Building - Harlem High School
Post-Bid
Harlem, GA 30814

CTE Modifications Healthcare Science & ROTC Labs
Renovation
Post-Bid
GA

Duluth High School - Softball Stadium and Site Preparation
Results
Duluth, GA 30096

Gordon Lee Hs Bleacher Replacement
Results
Chickamauga, GA

Transportation Facility and Staff Development Center - Divisions 1-28
New Construction - 14,873 SF
Construction
Blue Ridge, GA 30513

Roswell High School Renovation and Additions
Renovation, Addition
Construction
Less than $8,625,000 est. value
Roswell, GA 30075

SR 334 From SR 15 to SR 98
Infrastructure
Design
$4,000,000 est. value
Commerce, GA 30529

Construction Manager - New Middle School - Tift County
New Construction - 290,000 SF
Bidding
$80,000,000 est. value
Tifton, GA

Richmond Hill High School Replacement
New Construction - 516,369 SF
Post-Bid
Richmond Hill, GA

FCHS Agriculture Facility
New Construction, Renovation, Addition - 35,000 SF
Results
Less than $6,675,000 est. value
Carnesville, GA 30521

Last Updated 06/17/2022 03:30 AM
Project Title

Building and Site Improvements for Dalton High School

Physical Address View project details and contacts
City, State (County) Dalton, GA 30720   (Whitfield County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: In general, the Project will include Interior Renovation to the Cafeteria/Corridor, Gymnasium, Locker Rooms, and Drinking Fountains. Exterior Renovations to the Parking Lot and Drive Paving, New Concessions Building with separate Ticket Booth, Field Lighting, and other improvements.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents