Similar Projects
Focus Foods Manufacturing Center
Renovation, Addition
Conception
$1,700,000 est. value
Baton Rouge, LA 70873

7 Brew Coffee / Baton Rouge
Renovation, Infrastructure
Conception
$1,000,000 CJ est. value
Baton Rouge, LA 70808

New Elementary School (Southern District) - East Baton Rouge Parish School System
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Baton Rouge, LA 70802

MoveBR - Constantin (Midway - Bluebonnet) - City of Baton Rouge / Parish of East of Baton Rouge
Infrastructure
Design
$8,000,000 CJ est. value
Baton Rouge, LA 70808

RFQ Construction Manager at Risk - New STEM Complex, Southern University
Demolition, New Construction, Infrastructure
Bidding
$37,850,000 CJ est. value
Baton Rouge, LA 70807

LA 408: I-110 - End Of Concrete Section
Infrastructure
Bidding
$15,000,000 CJ est. value
Baton Rouge, LA 70818

Wildcat and Caddo Pine Island Fields
Infrastructure
Post-Bid
Baton Rouge, LA

Oilfield Site Restoration - Various Fields, DeSoto and Red River Parishes
Infrastructure
Post-Bid
Baton Rouge, LA

Mchugh Road Improvements
Infrastructure
Results
$444,761 est. value
Baton Rouge, LA

Various Fields in Iberia and Vermilion Parishes
Infrastructure
Results
Baton Rouge, LA

Shake Shack - Site Only
New Construction, Infrastructure - 3,503 SF
Construction
Baton Rouge, LA 70836

Renovations and Additions, Louisiana Governors Mansion, State Capitol Park
Addition, Demolition, Renovation, Infrastructure
Construction
$450,000 CJ est. value
Baton Rouge, LA 70802

Our Lady of the Lake Interdisciplinary Science Building
New Construction, Infrastructure - 148,000 SF
Pending Verification
$30,000,000 CJ est. value
Baton Rouge, LA 70806

I-10 BR - LA 415 to Essen - Louisiana Department of Transportation and Development (LaDOTD)
Infrastructure
Pending Verification
$50,000,000 CJ est. value
Baton Rouge, LA 70802

MoveBR - Mickens Rd (Hooper Rd - Joor Rd.) - City of Baton Rouge / Parish of East of Baton Rouge
Infrastructure
Conception
$25,000,000 CJ est. value
Baton Rouge, LA 70812

Last Updated 02/02/2023 11:10 AM
Project Title

Gron Fuels Renewable Diesel Plant

Physical Address View project details and contacts
City, State (County) Baton Rouge, LA 70802   (East Baton Rouge County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $9,200,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The total square footage of the project has not been announced. As of February 2, 2023, information regarding either an architect or general contractor has not been disclosed. A firm construction timeline has not been announced.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Manufacturing/Processing Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents