Reported | 12/11/2020 12:00 AM |
Project Title | Charlotte Mecklenburg Government Center (CMGC) Generators Replacement |
Physical Address | View project details and contacts |
City, State (County) | Charlotte, NC 282022844 (Mecklenburg County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $953,750 |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of replacing two (2) 475 kVA emergency paralleled generators in the sub-plaza level of the Government Center. The existing generators along with the existing paralleling gear, exhaust, fuel, cooling, and branch circuit systems shall be demolished and replaced. In detail these include, but are not limited to: two (2) existing radiators in the pit adjacent to the generator room, the existing paralleling gear, the exhaust piping stack up to the roof level, all existing cooling and fuel piping, the existing fuel pumps, and all electrical branch circuit for ancillary generator loads. The existing generators shall be removed in such a manner as to ensure they can be resold by the general contractor for a credit back to the City. Two (2) new CAT emergency-rated 500 kVA generators (purchased directly by the City) shall be installed along with a new 2000 amp, 480/277V switchboard (also purchased directly by the City), which shall replace the existing paralleling switchboard. The new generators shall be equipped with onboard paralleling technology. New control wiring shall be provided and installed to two (2) new annunciators and the existing building management system at the security desk adjacent to the elevator lobby on the sub-plaza level of the facility. A 1MW temporary generator shall be provided and installed by the electrical contractor adjacent to the street and exterior wall of the generator room to provide temporary backup power coverage while the existing gear systems are demolished and replaced. The general contractor is required to provide a construction schedule and participate in necessary pre-construction and construction progress meetings during the duration of the project. The City shall provide a commissioning agent to develop all commissioning scripts and testing procedures at the conclusion of construction activities. The General Contractor shall be responsible for all necessary materials and labor necessary for the performance of the scripted commissioning activities. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |