Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Virginia Avenue Housing Complex, Heat Pump Replacements
Results
$85,500 to $95,000 est. value
Columbia, MO 65201

Kitchen Hoods Inspection and Cleaning
Results
Columbia, MO 65202

Repair of East Cooling Tower for the City of Columbia Municipal Power Plant
Post-Bid
Columbia, MO 65201

Lange Middle Cooling Tower and Chiller Replacement
Results
Columbia, MO 65202

HVAC Services (City-Wide)
Term Contract, Alteration
Post-Bid
Springfield, MO

Ward Edwards NOC Cooling System Replacement Project
Results
Warrensburg, MO

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Rec-Plex South Evapco Cooling Tower Replacement and Warm Brine Supply Pipe Rerouting
Alteration
Results
Saint Peters, MO

HVAC
Alteration
Post-Bid
MO

Conservation Commission Headquarters Commission Meeting Room HVAC Replacement
Alteration
Results
$20,000 to $30,000 est. value
Jefferson City, MO

WPLM Administration Building HVAC
Alteration
Post-Bid
Saint Joseph, MO

HVAC Replacement in the Lathrop Elementary Gym
Alteration
Post-Bid
Lathrop, MO

2021 Mortuary Cooler
Alteration
Post-Bid
Troy, MO

Last Updated 07/22/2021 04:27 PM
Project Title

Air-Conditioning and Heating Units Installations

Physical Address View project details and contacts
City, State (County) Hopkins, MO   (Nodaway County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work includes: High School Gym will require: Demolition of 4 existing unit heaters and roof repair; supply and installation of two (2)18 ton RTUs (with hail guard, curbs, smoke detectors, barometric relief hoods, and propane kits), supply and replacement of air ductwork including double wall spiral pipe, line voltage wiring (100-amp 3 phase service for each unit, GFCI service receptacles with disconnects) new concrete pad, drain lines, gas lines, low voltage wiring and thermostats. High School Gym Entry will require: supply and installation of two (2)3.5 ton air-conditioners with matching evaporator coils, necessary ductwork, flue pipe, refrigerant and drain lines, low and line voltage wiring; connection of new equipment to existing furnaces. High School Lower Hallway will require: Supply and installation of one (1) new supply air lead and a fresh air damper, or one (1) 2-ton mini-split heat pump unit including tubing line, drain line, stand, and electrical.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents