Similar Projects
Fullerton Transportation Center ADA Improvements - 55053
Infrastructure
Conception
$1,000,000 est. value
Fullerton, CA 92832

Fullerton Transportation Center ADA Improvements - 55053
Infrastructure
Conception
$1,000,000 est. value
Fullerton, CA 92832

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Culver Drive Pavement Rehabilitation
Infrastructure
Post-Bid
$1,240,000 est. value
Irvine, CA 92604

FY 2021-22 Annual Pavement Preservation Project (Zone 6)
Infrastructure
Post-Bid
$6,220,000 CJ est. value
Yorba Linda, CA 92886

First Street Slope Stabilization Project (Rebid2)
Infrastructure
Results
$4,482,892 CJ est. value
Santa Ana, CA 92701

First Street Slope Stabilization Project (Rebid2)
Infrastructure
Results
$4,482,892 CJ est. value
Santa Ana, CA 92701

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Construction
$1,500,000 CJ est. value
Anaheim, CA 92801

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Construction
$1,500,000 CJ est. value
Anaheim, CA 92801

South Aircraft Parking Ramp Pavement Rehabilitation - City of Fullerton
Alteration
Conception
Less than $2,200,000 est. value
Fullerton, CA 92833

Grace Church Of Orange Sports Building
New Construction, Infrastructure - 8,662 SF
Design
$2,000,000 CJ est. value
Orange, CA 92869

Visitors Center Plaza Renovation and Site Utility Infrastructure Upgrades
Infrastructure, Renovation
Post-Bid
$5,723,000 CJ est. value
Irvine, CA 92618

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

San Juan Hills High School Turf Replacement Project
Infrastructure
Construction
$668,535 CJ est. value
San Juan Capistrano, CA 92675

Last Updated 09/19/2023 01:54 PM
Project Title

Hart Park Pickleball and Fitness Circuit - City of Orange

Physical Address View project details and contacts
City, State (County) Orange, CA 92866   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $5,927,288 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Per the owner, as of September 19, 2023, an award has been made for this solicitation. The owner has previously stated that they expect to go out to public bid for construction in early spring 2024. Closed solicitation has been included below for reference. ------------------- The City of Orange, a Municipal Corporation, is requesting proposals from qualified professional firms to provide architectural and engineering services for preparation of design and construction documents for the Hart Park Pickleball and Fitness Circuit project. Services requested include, but are not limited to all necessary architectural, landscape architectural and engineering services for the development and preparation of conceptual plans, design schemes, project budget, environmental documentation and related studies as necessary, construction plans, technical specifications, and schedule/timeline.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents