Similar Projects
Contract for the Purchase of a Submersible Pump
Post-Bid
San Antonio, TX

Well Plugging and Related Services: Padre Island National Seashore
Post-Bid
Austin, TX 78701

Construction of a New Water Well and Related Improvements
Results
TX

Plugging Abandoned Water Well
Results
$1,320 est. value
Irving, TX

Repair/Recondition One 50,000 GPM Vertical Centrifugal Water Pump (P-203)
Post-Bid
Baytown, TX 77520

Repair and Install Variable Frequency Drive on Irrigation Well 8
Results
Bushland, TX 79012

Water Well No. 2
Post-Bid
TX

Saws Water Well Mitigation Program
Results
Less than $97,000 est. value
San Antonio, TX

Granger Pines WWTP Site Work and Wet Well
Post-Bid
Conroe, TX 77301

Well Construction and Plugging of Existing Wells at the Fuller and Far North Well Sites
Results
TX

Well No. 2 Replacement
Post-Bid
Anthony, TX

Water Well Facilities for Pinewood Trails
Results
Less than $2,389,444 est. value
Cleveland, TX 77327

IFB Turbo Pump
Post-Bid
College Station, TX 77845

Plant 1 Improvements Contract 1 Water Wells #6 and #7
Results
$650,000 est. value
Tyler, TX 75706

Rockwall Heath High School Well Repair
Post-Bid
Heath, TX 75032

Last Updated 01/31/2020 09:49 AM
Project Title

Construction Services for Inspection of Water Well No 23

Physical Address View project details and contacts
City, State (County) The Woodlands, TX 77380   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $29,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The San Jacinto River Authority has identified the need for a Contractor to provide professional construction services for Inspection of Water Well No. 23 project. The Contractor shall furnish all required labor, materials, supplies and travel required in connect with the project. The SJRA expects that the project staff will include individuals with expertise in project construction, including reviewing detailed plans and specifications for the Inspection of Water Well No. 23 project, maneuvering through an environmentally sensitive area within an urbanized community. Work of the contractor is pulling the well, allowing for Owner inspection of the well components, TV inspection of well, and Contractor inspection at Contractor’s facility of components permitted for removal from site by Owner.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents