Similar Projects
Parkview Phase 2 Water Main Improvements
Infrastructure
Conception
$664,240 CJ est. value
Gretna, NE 68028

RFP D/B - OSS/SERE Ops Facility
New Construction, Infrastructure - 50,000 SF
Bidding
$100,000,000 CJ est. value
Offutt AFB, NE 68113

RFP D/B - OSS/SERE Ops Facility
New Construction, Infrastructure - 50,000 SF
Bidding
$100,000,000 CJ est. value
Offutt AFB, NE 68113

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

Gretna Middle School #3 - 70% CD Budget Update
New Construction, Infrastructure - 162,200 SF
Post-Bid
$44,000,000 CJ est. value
Richland Viii, NE 68028

US-6/Harrison ST
Infrastructure
Results
$5,000,000 est. value
NE

Papio Creek Intake Damper Replacement
Infrastructure
Results
$915,000 CJ est. value
Bellevue, NE 68123

Stadium Team Meeting Room Building - Papillion LaVista Public Schools
New Construction, Infrastructure - 4,950 SF
Construction
$940,500 CJ est. value
Papillion, NE 68046

Papillion Creek WRRF Biosolids and Energy Improvements 2022
New Construction, Infrastructure
Bidding
$20,158,751 CJ est. value
Bellevue, NE 68123

Southern Sarpy County Regional Wastewater System - Phase 1A - LS & FM
New Construction, Infrastructure
Post-Bid
$40,000,000 CJ est. value
Springfield, NE 68059

Sanitary Outfall Sewer - Section I for Sanitary and Improvement District 366, Sarpy County
Infrastructure
Results
$1,523,717 CJ est. value
Springfield, NE 68059

Highland Trails Storm Sewer and Paving - Sections 1 and 2
Infrastructure
Bidding
$10,400,000 CJ est. value
Gretna, NE 68028

Nebraska Army National Guard Bellevue Readiness Center (Milcon)
New Construction, Infrastructure - 95,000 SF
Post-Bid
$33,000,000 CJ est. value
Bellevue, NE 68123

Belterra SID 344, Sarpy County - Storm Sewer and Paving System - Section III
Infrastructure
Results
$3,707,390 CJ est. value
Springfield, NE 68059

Founders Ridge Sanitary Sewer Section 2
Infrastructure
Bidding
$503,000 CJ est. value
Papillion, NE 68046

Last Updated 09/22/2022 10:07 AM
Project Title

R&R Commerce Park South Additional Phases / Sarpy Industrial / Papillion

Physical Address View project details and contacts
City, State (County) Richland Viii, NE 68138   (Sarpy County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $449,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SWC Schram Road & South 150th Street, Omaha, NE 68138 Total of five buildings, five buildings totaling 1.3 million square feet. As of February 9, 2022, construction is expected to start in April 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 862,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents