Similar Projects
Banner Gilbert Medical Center Parking Lots
Design
Gilbert, AZ 85234

System Preservation
Bidding
Less than $14,600,000 est. value
Avondale, Phoenix, Tolleson, AZ

Roadway Construction, Stabilization, Paving and Traffic Calming Services
Infrastructure
Bidding
$5,000,000 est. value
AZ

Phase VII Pavement Replacement
Post-Bid
Guadalupe, AZ 85283

Update Pavement Management Program
Post-Bid
Cave Creek, AZ

Phoenix-Casa Grande Highway (I-10) 1-17 (Split) to SR 202L (Santan)
Results
Chandler, AZ 85225

Rittenhouse Road Bridge at Queen Creek Wash Improvements
Results
Queen Creek, AZ 85142

CarMax - Parking Lot
New Construction
Construction
Gilbert, AZ 85297

Riverpoint Parking Lot Addition
Addition
Construction
Phoenix, AZ 85040

Dynamite Boulevard - Pima Road to 136th Street Turn Bays and Bike Lanes
Infrastructure
Bidding
$800,000 to $1,200,000 est. value
Scottsdale, AZ 85268

Construction Manager at Risk Broadway Road (Phase 1) - Mesa Drive to Stapley Drive
Post-Bid
$25,000,000 to $30,000,000 est. value
Mesa, AZ 85210

Sun City Festival Ranch Planning Area 2 Parcel C2 Paving
Results
Buckeye, AZ 85326

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Bidding
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

Construction Firms to Provide Job Order Contract (Joc) Services
Post-Bid
Surprise, AZ 85374

New Facilities (Construction of New Roads)
Results
Less than $2,192,000 est. value
Maricopa, AZ 85138

Last Updated 05/27/2021 04:27 AM
Project Title

Pavement Preservation-Fy 2022-Group 1 Project

Physical Address View project details and contacts
City, State (County) Tempe, AZ   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work will consist of milling existing asphalt pavement and replacing with an asphaltic rubberized asphalt concrete pavement; sidewalks, curbs and gutter will be reconstructed; ADA ramps will be upgraded to standard; drainage structure improvements will include manhole adjustments and reconstruction of catch basins; restore existing pavement markings as well as new installations,

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents