Similar Projects
Construction Manager at Risk - Mesquite Street Lindsay to Val Vista ST2117 Ka-Lo Park- 29th Place Elliot to Mesquite Street
Infrastructure
Bidding
$5,669,000 est. value
Gilbert, AZ

American Disabilities Act Project Upgrades - Phase II
Post-Bid
$500,000 to $750,000 est. value
Chandler, AZ

Ocotillo Road Improvements - 148Th To Greenfield
Term Contract, Infrastructure
Post-Bid
$1,474,900 est. value
Gilbert, AZ

The Paseo
Results
Gilbert, AZ 85296

Construct Adaptive Ramp Metering
Results
Glendale, Peoria, Phoenix, AZ

Desert Meadows Pre-K Building and Additional Parking
Addition, Alteration
Construction
Laveen, AZ 85339

Cave Creek Road Improvements and Pedestrian Crosswalk Improvements Project
Infrastructure
Post-Bid
Carefree, AZ 85377

Job Order Contract for Citywide Civil/Site Work
Results
$10,000,000 est. value
Scottsdale, AZ

Concrete Improvements Rio Salado South Bank Multi use Path (MUP) East Extension
Infrastructure
Post-Bid
$1,000,000 est. value
Phoenix, AZ 85042

Adobe Mountain Parking Lot Upgrades
Results
Phoenix, AZ 85027

Peoria Sports Complex Maintenance Facility and Phased Field and Parking Improvements
Renovation, Infrastructure
Post-Bid
$400,000 est. value
Peoria, AZ 85382

Cemetary North Expansion - Phase II
Results
$79,980,755 est. value
Mesa, AZ 85201

Paving Resurfacing and Related Work to Alleys and Parking Lots
Results
Phoenix, AZ

Multi-Use Path
Results
Less than $1,200,000 est. value
Peoria, AZ 85383

Concrete Services
Term Contract
Results
$25,000,000 est. value
AZ

Reported 06/23/2022 08:51 AM
Project Title

L202 Red Mountain Shared-Use Path - Power to Brown - CP0732 - City of Mesa

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85207   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $3,305,950
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a sidewalk / parking lot in Mesa, Arizona. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot. Design and construct 2.5 miles of shared-use path to resolve a missing link in the regional non-motorized system. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of June 22, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents