Similar Projects
H266--Monthly Isolation/OR Air Quality Test (Va-22-00008550)
Term Contract
Design
NC 28805

Design - Exterior Abatement Buildings 14, 15
Alteration
Design
$250,000 to $500,000 est. value
Asheville, NC 28805

RFQ Design - Stephens-Lee Recreation Center Capital Improvements
Renovation
Bidding
$1,574,308 CJ est. value
Asheville, NC 28801

RFQ Design - Stephens-Lee Recreation Center Capital Improvements
Renovation
Bidding
$1,574,308 CJ est. value
Asheville, NC 28801

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

Engineering, Planning and Development
Post-Bid

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

C219--637-21-902 Security Camera Upgrades Design (Va-21-00041716)
Post-Bid
$400,000 est. value
Asheville, NC 28805

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

Weaverville Pump Station Replacement
Alteration
Post-Bid
Asheville, NC

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Multiple Award Contract (MAC), Indefinite Delivery /Indefinite Quantity (IDIQ), Architect-Engineer (A-E) Traffic Engineering and Transportation Planning Services in Support of Projects Primarily in the Mid-Atlantic (NAVFAC MIDLANT) Area of Responsibility
Term Contract
Post-Bid
$40,000,000 est. value

Reported 09/30/2022 12:00 AM
Project Title

RFQ Design - Shower Repair / Renovation and Mezzanine Screen Installation at the Buncombe County Detention Center

Physical Address View project details and contacts
City, State (County) Asheville, NC 28801   (Buncombe County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Bidding, Accepting Qualifications,
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Buncombe County is seeking candidates interested in designing a shower repair/renovation and the installation of mezzanine screening at the Detention Center. Questions about the submittal process may be asked by contacting the General Services Department of Buncombe County at (828) 250-4233 or generalservices@buncombecounty.org. The Buncombe County Detention Center is located at 20 Davidson Drive, Asheville, NC 28801. The center consists of two facilities. The shower repair/renovation consists of showers located in the housing units of the North Tower, constructed in 1994. The mezzanine screening will be installed in two housing units in the Central Tower, constructed in 2006. Services provided by the firm or individual will include, but are not limited to: Design of a shower repair/renovation to address current issues with ceramic tile failure and water infiltration. Design for screening to prevent falls and injuries at the mezzanine and staircase. Cost estimating. Bid form development utilizing alternates to maximize the available budget. Bid administration for the project. Construction administration for the project including DHSR Submittal and Approval Any questions about the submittal process should be directed to the Buncombe County General Services Department via email at generalservices@buncombecounty.org.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents