Similar Projects
248th Avenue - 95th Street to 103rd Street - SC190 - City of Naperville
Infrastructure, Renovation
Conception
$7,175,000 CJ est. value
Naperville, IL 60564

248th Avenue - 95th Street to 103rd Street - SC190 - City of Naperville
Infrastructure, Renovation
Conception
$7,175,000 CJ est. value
Naperville, IL 60564

Dog Haus Restaurant
New Construction, Infrastructure - 651 SF
Design
$250,000 CJ est. value
Bolingbrook, IL 60490

Wayfair Fulfillment Center - Airport Logistics Center 2 / Romeoville
New Construction, Infrastructure - 1,200,000 SF
Design
$129,600,000 CJ est. value
Plainfield, IL 60544

Holiday Inn Express & Suites / Peotone - Rebid
New Construction, Infrastructure - 45,000 SF
Post-Bid
$13,600,000 CJ est. value
Peotone, IL 60468

Holiday Inn Express & Suites / Peotone - Rebid
New Construction, Infrastructure - 45,000 SF
Post-Bid
$13,600,000 CJ est. value
Peotone, IL 60468

RR-21-4583R Weigh-In-Motion Replacement
Infrastructure
Results
Homer Glen, IL 60491

Construction Installation of Temp. Soldier
Infrastructure
Results
Joliet, IL

Bridge Point Romeoville
New Construction, Infrastructure - 660,280 SF
Pending Verification
$70,000,000 CJ est. value
Romeoville, IL 60446

Bridge Point Romeoville
New Construction, Infrastructure - 660,280 SF
Pending Verification
$70,000,000 CJ est. value
Romeoville, IL 60446

87th St. Bridge Over Springbrook Creek - BR019 - City Of Naperville
New Construction, Infrastructure
Conception
$1,734,000 CJ est. value
Naperville, IL 60564

Willow Tree Farm Subdivision / Plainfield
New Construction, Infrastructure - 21,759 SF
Design
$42,652,136 CJ est. value
Plainfield, IL 60544

House of Harvest
New Construction, Infrastructure - 3,500 SF
Post-Bid
$934,500 CJ est. value
Plainfield, IL 60544

Crack Sealing W/Crack Routing Asphalt Pavement (20,000 Ft.)
Infrastructure
Results
Romeoville, IL

Farnsworth Avenue Bridge Phase III - City of Aurora
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Aurora, IL 60503

Last Updated 07/24/2023 01:14 PM
Project Title

Removal of Existing 4-span Bridge Along Shepley Road

Physical Address View project details and contacts
City, State (County) Troy Township, IL 60404   (Will County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $4,283,283 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

(1,195-Ff) Removal of existing 4-span bridge along Shepley Road over I-80 in Will County, IL and replacement with a 2-span 264'-00" long, 36'-10" out to out wide bridge. Bridge approach roadway improvements include pavement reconstruction, shoulder construction, guardrail replacement, and maintenance of traffic control. Region 1 District 1 Federal Project # NHPP5TRB(226) County(s) Will Key Route(s) FAI 80 Marked Route(s) I-80 Section(s) 2021-007-B State Job #(s) C-91-114-21 PPS #(s) 1-77247-1200 Project Labor Agreement Completion Date: September 30, 2023 Plus 10 Working Days Questions not accepted as of November 08, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 28, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 063 - Removal of Existing 4-span Bridge Along Shepley Road

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents