Similar Projects
CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Design
Fresno, Sequoia National Park, CA

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Design
Fresno, Sequoia National Park, CA

Construct Soldier Pile Retaining Wall, Repair RSP and HMA paving
Infrastructure
Bidding
$16,000,000 est. value
CA

Excavation, HMA, Structural Concrete, Minor Concrete and Drainage
Infrastructure
Bidding
$23,400,000 est. value
CA

Highway Safety Improvement Program HSIP 8 Oakland Hills
Infrastructure
Post-Bid
Oakland, CA

Imola Ave and SR-29 Express Bus Improvements Project
Infrastructure
Post-Bid
$2,600,000 est. value
Napa, CA 94559

2021 Northern Region Road Rehabilitation: Phase 2
Infrastructure
Results
$650,000 est. value
CA

2021 Redwood Highway Frontage Road Pavement Repair Phase 1
Infrastructure
Results
$350,000 est. value
Mill Valley, CA 94941

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Asphalt Concrete Paving and Striping Services
Infrastructure
Bidding
$300,000 est. value
Sacramento, CA

Paving Repairs and Ramps at FHFB
Term Contract
Post-Bid
Richmond, CA

2021 Road Sealant, Phase 2
Infrastructure
Results
CA

CA ERFO KLAMATH NF 18N31(1) UPPER WEST BRANCH BRIDGE
Renovation, Alteration
Design
CA

Roadway Excavation, Cold Plane AC Pavement, and Overlay
Infrastructure
Bidding
$4,650,000 est. value
CA

Place Hma and Perforated Plastic Pipe Underdrain
Infrastructure
Post-Bid
$16,200,000 est. value
CA

Last Updated 10/25/2021 05:36 AM
Project Title

B Street Improvements - Childs Avenue to East 15th Street

Physical Address View project details and contacts
City, State (County) Merced, CA 95341   (Merced County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed includes but not limited to the grinding and disposal of asphalt paving. Full Depth Reclamation (FDR), installation of 3-inch asphalt paving, ADA ramps, sidewalk, water and storm main, curb & gutter, bus pu I louts, residential and commercial approaches and trafic markings. The project is located on B Street between Childs Avenue and East 15,h Street in the City of Merced, California.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents