Similar Projects
Coweta County Jail EIFS Repair
Renovation
Post-Bid
Newnan, GA 30263

Pierce County Jail Addition - Construction Management At Risk
Post-Bid
Blackshear, GA

Correctional Facility Renovations and Additions
Renovation, Addition
Results
Less than $2,094,532 est. value
Lovejoy, GA

Construction Manager at Risk (CMAR) Services for Rabun County Sheriffs Administration Building
New Construction - 6,000 SF
Results
Clayton, GA 30525

Renovation of the Correction Facility For Clayton County
Post-Bid
Lovejoy, GA 30236

Addition to the Bulloch County Jail
Addition
Results
Statesboro, GA

Tooms County Courthouse and Detention Center Renovation and Expansion Project
Renovation, Addition - 55,000 SF
Post-Bid
$25,000,000 to $35,000,000 est. value
Lyons, GA 30436

Construction Manager at Risk (CMAR) Services for Rabun County Jail Addition and Sheriff's Administration Building
Addition - 6,000 SF
Results
GA

Rabun County Jail and Sheriffs Administration Building
Post-Bid
Clayton, GA

Arrendale State Prison RSAT Building and Gym Retrofit Roof, Structural Repair and Environmental Services
Results
Alto, GA 30510

Fayette County Sheriff's Office Jail Lobby Renovation
Renovation
Results
Woolsey, GA 30214

Dodge State Prison Improvements
Results
Chester, GA 31012

Kosher Packaged Meal Production Kitchen
Results
Milledgeville, GA 31061

Jail Construction
Renovation
Results
Less than $398,000 est. value
Moultrie, GA 31768

Construction Management Services for Jail Dorm Infill
Results
Less than $350,000 est. value
Jefferson, GA 30434

Reported 05/21/2021 12:00 AM
Project Title

Hart County Jail

Physical Address View project details and contacts
City, State (County) GA   (Hart County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Hart County is accepting proposals for a Construction Manager firm to assist with design phase services and to provide complete construction phase services for the construction of a 140 -200 bed jail facility. The Construction Manager will provide expertise in bringing a comprehensive, collaborative plan to the Commissioners to outline the design and costs of the jail. The schematic design must include understanding, defining, and resolving the current and future needs of the jail and must present a cost summary of the base project along with alternate options for cost control. A single floor new facility will house treatment rooms, offices, Kitchen facilities, rooms for inmate and family/attorney meetings, Bond hearings, trustee housing, and book-in area with holding cells and prefabricated modular jail cells and monitoring areas for the jail staff.

Details

Prison/Jail, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents